# 2631 Hornsby — Site Diary — 07/07/2026

**Job:** 01-2275 — HPE Field of Play Hornsby
**Date:** Tuesday, 7 July 2026
**Diary Ref:** 2631-2026-07-07
**Supervisor:** Rocky
**Weather:** Overcast

---

## Site Report

**Crew:** Leem, Maddie — 2 men, started 7am, knocked off ~5–5:30pm (~10–10.5 hrs each).

**Work done:**
- Blinding poured for **VAR-005 thickening beam** (footpath to be built on top of beam).
- Strip formwork shuttered with **93mm LVL + star pickets** along the trench.

**Deliveries:** None reported.

**Delays / disruptions:** None reported.

**Client instructions:** VAR-005 thickening beam — blinding poured, footpath to be built on top.

**Safety / TBT:** Nil.

---

## Photos (11 filed)

All photos vaulted to: `…/01-2275 - HPE Field of Play Hornsby/07 - Site Documents/07d - Daily Diary/2026-07-07 - VAR-005 Thickening Beam Blinding/photos/`

1. `img_bc9691a8f9d1.jpg` — Fresh blinding strip in trench, wood-formed edge, rebar caps down the side.
2. `img_2c6af5435fff.jpg` — Worker trowelling blinding strip, yellow rebar caps in line.
3. `img_984fea27129b.jpg` — Strip footing pour with swirl-trowel finish, yellow markers along edge.
4. `img_c1905710264e.jpg` — Roadside drainage/kerb section, 3–4 crew in hi-vis.
5. `img_47a6f3f8a8e3.jpg` — Long kerb/footpath pour with yellow survey markers, hi-vis worker in distance.
6. `img_6b8fb9488f4b.jpg` — Excavated corridor with yellow bollards, plate compactor and dumper working.
7. `img_9921794234e0.jpg` — Kobelco excavator on trench, 'Solutions' branding.
8. `img_5e940b0b6fb2.jpg` — Kobelco SK-series excavator grading road/driveway alignment.
9. `img_03101f0d772b.jpg` — Wooden plank edge with yellow markers along trench, two workers up slope.
10. `img_99411070c393.jpg` — Deep cut with concrete blocks as retaining edge, Hitachi excavator on upper level.
11. `img_ce84508c8866.jpg` — Row of concrete blocks/boulders across site, road being built up the hill.

---

*Source: Telegram — 2631 Hornsby diary, voice note + 11 photos. Approved by Rocky.*