job_number: 01-2275
sub_contract: S01-2275-011
client: Solutions Plus Built Pty Ltd
client_contact: Joel Alvey
client_phone: 1300 653 013
client_email: invoices@solutionsplus.au
site: HPE Field of Play - Hornsby Park Embellishments
address: Old Mans Valley South, 1 Bridge Rd, Hornsby NSW 2077
status: upcoming
type: hybrid
contract_price: 324015.06
contract_price_ex_gst: true
dayworks_rate_labour: 100
dayworks_markup_materials: 0.25
hourly_rates_inherit: lfcs-standards/rate-card.md
client_signatory:
  name: Joel Alvey
  role: Solutions Plus Site Rep / Contract Administrator
  phone: 1300 653 013
  email: invoices@solutionsplus.au
start_date: 2026-04-30
target_completion: 2026-10-15
duration_weeks: 24
float_weeks: 3
working_hours: "07:00 - 17:30"
working_days: "6 days/week (Mon-Sat)"
liquidated_damages_per_day: 250
payment_claims_due: "25th of each month"
retention_pct: 0.05
productivity_target_m2_day: 160
productivity_stretch_m2_day: 180
drawings_revs:
  civil: B
  finishes: C
  landscape: D
inductions: HammerTech (must complete before site)
created: 2026-04-29
---

# Job Brief — 01-2275 HPE Field of Play Hornsby

LF Construction Services is engaged by **Solutions Plus Built Pty Ltd** for all concrete installation works at the **HPE Field of Play, Hornsby Park Embellishments** (Old Mans Valley South). Works to be executed in accordance with IFC drawings Rev B (civil), Rev C (finishes), Rev D (landscape).

## Scope (5 BOQ items)

| # | Description | Qty | Unit | Rate | Contract Value |
|---|---|---|---|---|---|
| 1 | Form, Reinforce, Pour & Exposed Aggregate | 2,322 | m² | $66.25 | $153,832.50 |
| 2 | Form, Reinforce, Pour & Broom Finish | 4,047 | m² | $34.48 | $139,525.50 |
| 3 | Install Key Joints (Connolly) | 1,284 | m | $13.00 | $16,692.00 |
| 4 | Form, Reinforce, Pour & Finish Pram Ramp | 2 | each | $550.00 | $1,100.00 |
| 5 | Stairs (concrete) | 1 | item | $12,850.00 | $12,850.00 |
| | **TOTAL CONTRACT VALUE (ex-GST)** | | | | **$324,000.00** |

(Rounded; exact figure $324,015.06)

## Key risks identified at quote stage

See `_risk-register.md` for the full register. Top 5:
1. **Sub-base not ready at start** — H/H — `R1` — issue notice if not handed over by 15 May
2. **Concrete pump unavailable on pour day** — M/H — `R2` — confirm 5 days before each pour
3. **Weather delay** — H/M — `R3` — variation per Clause 9, document daily
4. **EA panel fails (wash timing)** — M/H — `R4` — trial panel first pour
5. **Liquidated damages — programme slip** — M/H — `R10` — maintain 9+ wks float

## Key dates / milestones

| Date | Event |
|---|---|
| **2026-04-30** | **START — Day 1 mobilise + HammerTech inductions** |
| 2026-05-15 | Sub-base S/SE certified handover deadline |
| 2026-05-25 | Claim 1 due (target $25–35K) |
| 2026-06-25 | Claim 2 due (target $80–100K — all EA complete) |
| 2026-07-25 | Claim 3 due |
| 2026-08-25 | Claim 4 due |
| 2026-09-17 | Annexure B closeout deliverables due |
| 2026-09-25 | Claim 5 due |
| 2026-10-15 | **Target Practical Completion** |
| 2026-10-25 | Final Claim + retention release |

## Crew / labour plan (summary — see `_crew-plan.md`)

- Foreman / Site Supervisor: full-time (~144 working days)
- Concretor — Forming: ~80 days, 2-3 men
- Concretor — Reo: ~80 days, 2-3 men
- Concretor — Pour & Finish: ~40 pour days, 4-5 men
- Labourer / Washer: ~15 EA wash days, 2 men

## Pre-start RFIs

**25 pre-start questions** (Categories A/B/C) pre-populated in `06 - Correspondence/06b - RFIs/_REGISTER.md`. Status `Pending` for all. **Get all Category A answered in writing before mobilisation 30 April.**

## Sequencing (S/SE → NW)

Front-load high-margin EA work, start at the SE corner with stairs and pram ramps (most complex, fixed-price items), then track north-west through exposed aggregate, then broom finish.

See `04 - Programme and Scheduling/programme-24wk.md` for the week-by-week plan and `04 - Programme and Scheduling/sequencing-strategy.md` for the rationale.

## Programme float

Starting 30 April gives 24 weeks to 15 October — **3 weeks more float than originally assumed**. Works programme completes by Week 21, leaving Wk 22-24 as pure contingency for weather, access delays, and rectifications. If productivity reaches 180 m²/day, pouring completes by Wk 10 (~11 wks float).

## Profit strategy

See **`_strategy.md`** at job root (LFCS internal — not for client distribution). 8 levers ranked by impact, including:
1. Productivity 160 → 180+ m²/day
2. Curing as variation (excluded from quote)
3. Variation capture for weather + hindrance
4. Sawcuts as add-on scope
5. Front-load payment claims
6. Formwork reuse 3-4 cycles
7. Mesh vs bar confirmation
8. No-rework quality discipline

## Notes from planning session

Source plan generated by Cowork (Claude Desktop) on 2026-04-29 — extracted document saved as `_source-plan.md` for reference.

**Watch-outs flagged at planning stage (v2 plan, 2026-04-29):**
- Curing is EXCLUDED from quote — issue RFI (B3) before applying any cure products at LFCS cost
- Sawcuts not priced — Solutions Plus must decide before mobilisation (B4)
- Coloured concrete consistency requires approved supplier in writing (B7)
- Engineer sign-off after pours is Solutions Plus's responsibility — do not accept backcharge (B8)
- RW11 sandstone wall on west boundary may delay western panels (R6)