job_no: 2602 (per `2602-Rate-Buildup_v-CC.xlsx` + `2602-Pre-Pricing-Grill-2026-05-04_v-CC.docx`)
project_code: P424
job_name: Hammond Canal Bridge — Munmorah Power Station
hc: TCE Contracting (Dec Projects sub-package — `02 - Scope & Pricing/BOQ & Rate Schedules/DEC Projects Estimators/`)
end_client: Origin Energy / Munmorah Power Station owner (confirm)
site: Munmorah Power Station, NSW (postcode TBC)
scope: bridge / civil structure — FRP package per `P424-HCB-BOQ-FRP-Package.xlsx`
design_maturity: Issued for Construction (90% IFC + working) — Munmorah Power Station SW REV 2 working + NL251342_S__COMBINED_90_ IFC + ST251342_Munmorah Power Station Bridge_TCE_rev1
outcome: submitted (Letter of Offer dated; status TBC)
status: completed (per Rocky 2026-05-09)
source: shared-drive Google Drive bulk-download `TCE 242 HCB Bridge-20260509T052904Z-3-001.zip`
ingested: 2026-05-09 by lfcs-orchestrator
purpose: Precedent reference for `lfo-precedent-finder` — bridge + FRP package pricing
---

# 2602 — TCE 242 HCB Bridge (Hammond Canal Bridge / Munmorah Power Station)

**Same project as existing `Operations/Jobs/Upcoming/2602 - Dec Projects - Munmorah Bridge/`.** This `Completed Jobs/` folder is the more recent Drive snapshot. The Upcoming/ folder may have orchestrator-added artefacts (CLAUDE.md, _Log.md, _audit/) not present here. Future task: reconcile the two folders or symlink one to the other.

## Quick metadata

| Field | Value |
|---|---|
| HC | TCE Contracting |
| Sub-tier | Dec Projects (estimating) |
| End-client | Munmorah Power Station owner — Origin Energy / NSW Govt (confirm) |
| Site | Munmorah Power Station, NSW central coast |
| Project code | P424 (TCE-side) |
| Bridge name | Hammond Canal Bridge (HCB) |
| Scope | FRP package — formwork + steel-fix + concrete place&finish + curing on bridge structure |
| Drawings | `03 - Plans & Specifications/Issued for Construction/` — 4 PDFs incl. `ST251342_Munmorah Power Station Bridge_TCE_rev1.pdf` |
| BoQ | `02 - Scope & Pricing/BOQ & Rate Schedules/P424-HCB-BOQ-FRP-Package ver 1.1.xlsx` (TCE-issued) + `(1) - LFCS submission.xlsx` (LFCS-priced) |
| Rate Build-up | `02 - Scope & Pricing/BOQ & Rate Schedules/2602-Rate-Buildup-2026-05-04_v-CC-rev2.xlsx` |
| Pre-Pricing-Grill | `02 - Scope & Pricing/Quotes & Estimates/2602-Pre-Pricing-Grill-2026-05-04_v-CC.docx` |
| Letter of Offer | `02 - Scope & Pricing/BOQ & Rate Schedules/DEC Projects Estimators/Letter of Offer - Hammond Canal Bridge - LFCS submission.docx` |
| Tender Summary | `02 - Scope & Pricing/Quotes & Estimates/2602-Tender-Summary-Draft-2026-05-04_v-CC-rev2.xlsx` |
| Inclusions / Exclusions | `02 - Scope & Pricing/Quotes & Estimates/2602-Inclusions-Exclusions_v-CC.docx` |
| Drawing Index | `02 - Scope & Pricing/Quotes & Estimates/2602-Drawing-Index_v-CC.docx` |

## For `lfo-precedent-finder`

Strong-match signals:
- HC = TCE
- Site type = bridge
- Scope items = formwork + steel-fix + concrete + curing (full 4 items)
- Design maturity = 90% IFC / working
- Site postcode region = NSW central coast (Munmorah)

Weak-match signals (fill on deep extraction pass):
- Final submitted total ex GST — extract from Letter of Offer
- Won/lost outcome — confirm with Rocky
- Specific complexity factors applied — extract from Pre-Pricing-Grill
- LAFHA in/out — likely IN given Munmorah location (~120 km from Botany, well over §13.1 threshold)
- Adverse weather posture — likely INCLUDED given outdoor bridge site

## Open follow-ups

1. Reconcile with `Operations/Jobs/Upcoming/2602 - Dec Projects - Munmorah Bridge/` — same job, two folders
2. Read Pre-Pricing-Grill.docx + Tender-Summary.xlsx for full pricing methodology used
3. Confirm outcome (won/lost/awarded) with Rocky — file says "submitted"
4. Extract postcode for §13.1 LAFHA precedent