job_no: TBC
project_code: TBC
job_name: Cerak Construction - Frank Gray Oval
hc: Cerak Construction
end_client: TBC (likely council — Frank Gray Oval is a public sportsground)
site: Frank Gray Oval (likely Mount Pritchard / Fairfield LGA, NSW)
postcode: TBC (Frank Gray Oval — public oval; 2170 area)
scope: carpentry — day labour (NOT LFCS standard 4 FRP; no formwork/steel-fix/concrete/curing in mirror)
design_maturity: n/a (day labour engagement)
outcome: in-progress (status=ongoing; docket 0659 raised WE 13/07/2025)
status: Ongoing
source: "[source: friend-vault] C:/Users/mclou/lfcs-precedent-staging/lfcs-obsidian-vault-mirror/01 - Jobs/Cerak Construction - Frank Gray Oval/"
ingested: 2026-05-10 by lfcs-orchestrator (lfo-precedent-import)
purpose: Precedent reference for `lfo-precedent-finder` — Cerak Construction HC posture / day-labour engagement / public-oval site
EXCLUDE-FROM-PRECEDENT-FINDER-UNTIL-COMPLETE: false
---

# Cerak Construction - Frank Gray Oval

**Folder structure note:** Hus's vault — minimal `_Job Overview.md`. Single docket logged (0659, WE 13/07/2025).

**Scope note:** Day-labour carpentry engagement. Cerak is the HC; site is a public oval (likely council client downstream). Useful as a Cerak Construction HC precedent — second Cerak job in the corpus alongside Padstow.

## Quick metadata

| Field | Value |
|---|---|
| HC | Cerak Construction |
| End-client | TBC (likely council — Frank Gray Oval public sportsground) |
| Site | Frank Gray Oval, NSW |
| Postcode | TBC (Frank Gray Oval — needs lookup; likely Mount Pritchard 2170) |
| Project code | TBC |
| Scope | Carpentry — day labour |
| Drawings | n/a (day labour) |
| BoQ | n/a (day labour — single xlsx tracker) |
| Rate Build-up | per Rate Card (no project-specific buildup) |
| Pre-Pricing-Grill | n/a (day labour) |
| Letter of Offer | TBC |
| Tender Summary | n/a |
| Inclusions / Exclusions | n/a (day labour terms) |
| Drawing Index | n/a |
| Final submitted total ex GST | TBC (open dockets) |
| Outcome | Ongoing — docket raised, not yet claimed |

## For `lfo-precedent-finder`

Strong-match signals:
- HC = Cerak Construction (also see Cerak - Padstow precedent)
- Site type = public oval / sportsground
- Scope items = none of {formwork, steel-fix, concrete, curing} — day-labour carpentry
- Design maturity = n/a (day labour)
- Site postcode region = Western Sydney (TBC — Mount Pritchard 2170 area)

Weak-match signals (extract on deep-pass if precedent fires):
- Cerak engagement model: day labour with docket numbering ~0600s series
- Final submitted total ex GST: TBC
- LAFHA decision: if 2170 area → Botany ~45 min drive → §13.1 = borderline-OUT (45-min threshold)
- HC-pattern: Cerak appears to use day-labour subcontract model (vs lump-sum) → useful posture signal for any future Cerak RFQ

## Open follow-ups

1. Frank Gray Oval exact postcode (council confirmation)
2. End-client (Fairfield Council? other?)
3. Scope detail — what carpentry (formwork? framing? joinery?)
4. Contract terms (rate, OT loadings, mob/demob)
5. Whether Cerak is a recurring HC for LFCS (look for sibling Cerak jobs)