job_no: TBC
project_code: TBC
job_name: Cerak Construction - Padstow
hc: Cerak Construction
end_client: TBC
site: Padstow, NSW
postcode: 2211
scope: carpentry — billing model TBC (NOT LFCS standard 4 FRP; no formwork/steel-fix/concrete/curing in mirror)
design_maturity: TBC
outcome: in-progress (status=ongoing in source)
status: Ongoing
source: "[source: friend-vault] C:/Users/mclou/lfcs-precedent-staging/lfcs-obsidian-vault-mirror/01 - Jobs/Cerak Construction - Padstow/"
ingested: 2026-05-10 by lfcs-orchestrator (lfo-precedent-import)
purpose: Precedent reference for `lfo-precedent-finder` — Cerak Construction HC posture / South-West Sydney site
EXCLUDE-FROM-PRECEDENT-FINDER-UNTIL-COMPLETE: false
---

# Cerak Construction - Padstow

**Folder structure note:** Hus's vault — minimal `_Job Overview.md`. Job tracker xlsx referenced but not in mirror.

**Scope note:** Carpentry works (granularity TBC). Cerak is the HC. Sibling to Cerak - Frank Gray Oval — together establish Cerak HC precedent pair.

## Quick metadata

| Field | Value |
|---|---|
| HC | Cerak Construction |
| End-client | TBC |
| Site | Padstow, NSW |
| Postcode | 2211 |
| Project code | TBC |
| Scope | Carpentry — billing model TBC |
| Drawings | TBC |
| BoQ | TBC |
| Rate Build-up | per Rate Card (no project-specific buildup in mirror) |
| Pre-Pricing-Grill | TBC |
| Letter of Offer | TBC |
| Tender Summary | TBC |
| Inclusions / Exclusions | none in mirror |
| Drawing Index | none |
| Final submitted total ex GST | TBC |
| Outcome | Ongoing — no claims submitted yet |

## For `lfo-precedent-finder`

Strong-match signals:
- HC = Cerak Construction (sibling: Cerak - Frank Gray Oval)
- Site type = TBC (Padstow — South-West Sydney; could be residential, commercial, or civils)
- Scope items = none of {formwork, steel-fix, concrete, curing} confirmed — pure carpentry
- Design maturity = TBC
- Site postcode region = 2211 Padstow / South-West Sydney

Weak-match signals (extract on deep-pass if precedent fires):
- Final submitted total ex GST: TBC
- LAFHA decision: Padstow 2211 → Botany ~30 min drive → §13.1 = OUT (auto-decidable)
- Cerak HC pattern: see Frank Gray Oval — day-labour leaning. Padstow billing model TBC (price vs day vs hybrid)

## Open follow-ups

1. Site type (residential? commercial fit-out? civils?)
2. Scope detail
3. Contract value
4. Pricing model (lump sum vs day labour vs hybrid — sibling Frank Gray Oval is day labour)
5. End-client identity