---
job_no: TBC
project_code: TBC
job_name: FKR - Paddington
hc: FKR
end_client: TBC
site: 92 Paddington, NSW
postcode: 2021
scope: structural carpentry — dual model (priced dockets + day labour) — NOT LFCS standard 4 FRP (no formwork/steel-fix/concrete/curing); structural carpentry only
design_maturity: BoQ + PC Schedule in place (suggests at-least-construction-ready design)
outcome: in-progress (status=ongoing; multiple dockets raised Aug–Oct 2025)
status: Ongoing
source: "[source: friend-vault] C:/Users/mclou/lfcs-precedent-staging/lfcs-obsidian-vault-mirror/01 - Jobs/FKR - Paddington/"
ingested: 2026-05-10 by lfcs-orchestrator (lfo-precedent-import)
purpose: Precedent reference for `lfo-precedent-finder` — FKR HC posture / dual priced+day-labour engagement / structural carpentry / Eastern Suburbs site
EXCLUDE-FROM-PRECEDENT-FINDER-UNTIL-COMPLETE: false
---

# FKR - Paddington

**Folder structure note:** Hus's vault — `_Job Overview.md` plus references to BOQ pdf, PC Schedule xlsx, dual price/day-labour trackers. Heavy artefacts at source path only.

**Scope note:** Structural carpentry, NOT LFCS FRP (formwork/steel-fix/concrete/curing). Most informative FKR job in mirror — has BOQ, PC Schedule, and dual billing model documented. Strongest precedent for FKR HC engagement patterns and structural-carpentry posture.

## Quick metadata

| Field | Value |
|---|---|
| HC | FKR |
| End-client | TBC |
| Site | 92 Paddington, NSW |
| Postcode | 2021 |
| Project code | TBC |
| Scope | Structural carpentry — priced + day labour dual model |
| Drawings | TBC (referenced via PC Schedule) |
| BoQ | `BOQ - 92 Paddington - Structural Carpentry (with breakdown).pdf` (at source) |
| Rate Build-up | `PC Schedule - 92 Paddington - Structural Carpentry.xlsx` + `FKR - Paddington (Price).xlsx` (at source) |
| Pre-Pricing-Grill | TBC |
| Letter of Offer | TBC |
| Tender Summary | TBC |
| Inclusions / Exclusions | none in mirror |
| Drawing Index | TBC |
| Final submitted total ex GST | TBC (multiple priced dockets 0044–0046 + day-labour 0575–0587) |
| Outcome | Ongoing — dockets raised Aug–Oct 2025 |

## For `lfo-precedent-finder`

Strong-match signals:
- HC = FKR (sibling: FKR - Bourke Street)
- Site type = inner-city residential / heritage (Paddington terraces likely)
- Scope items = structural carpentry (not in LFCS standard 4) — but most useful FKR precedent for engagement structure
- Design maturity = construction-ready (BoQ + PC Schedule in place)
- Site postcode region = 2021 Paddington / Eastern Suburbs Sydney

Weak-match signals (extract on deep-pass if precedent fires):
- FKR engagement model: dual priced (lump-sum dockets) + day labour — FKR allows hybrid pricing → useful negotiation precedent
- Docket numbering: priced ~0044–0046 series; day-labour ~0575–0587 series → suggests separate FKR cost codes
- Final submitted total ex GST: TBC (open dockets)
- LAFHA decision: Paddington 2021 → Botany ~20 min drive → §13.1 = OUT (auto-decidable)
- Design-doc pattern: BoQ + PC Schedule both supplied → FKR provides full pricing-doc package upfront (vs man-hours-only at Bourke St)

## Open follow-ups

1. End-client (developer? owner? heritage council?)
2. Final outturn $ once dockets close
3. Pricing-vs-day-labour ratio (how much of total scope went each way)
4. Whether BoQ structure could inform LFCS FRP BoQ shaping
5. FKR PM contact
