job_no: TBC
project_code: TBC
job_name: Ford Civil - Botany
hc: Ford Civil Pty Ltd
end_client: TBC
site: Botany, NSW
postcode: TBC (Botany NSW ~2019)
scope: carpentry (formwork carpentry — day labour)
design_maturity: TBC (day-labour mode — no fixed-price IFC submission)
outcome: in-progress
status: Ongoing
source: "[source: friend-vault] C:/Users/mclou/lfcs-precedent-staging/lfcs-obsidian-vault-mirror/01 - Jobs/Ford Civil - Botany/_Job Overview.md"
ingested: 2026-05-10 by lfcs-orchestrator (lfo-precedent-import)
purpose: Precedent reference for `lfo-precedent-finder` — carpentry day-labour, Ford Civil HC
---

# Ford Civil - Botany

**Folder structure note:** Source is Hus's vault `01 - Jobs/` single-file shape (`_Job Overview.md` only — no Drive 11-folder mirror present in friend-vault). Heavy artefacts (man-hours xlsx) referenced but not mirrored per `digest-only` mode + friend-vault read-only constraint per CLAUDE.md §3.1.

## Quick metadata

| Field | Value |
|---|---|
| HC | Ford Civil Pty Ltd (top-client; 49.6% of LFCS day-labour revenue Sep 2025–Apr 2026) |
| End-client | TBC |
| Site | Botany, NSW |
| Postcode | TBC — likely 2019 (Botany NSW) |
| Project code | TBC |
| Scope | Carpentry works — day labour / man hours billing |
| Drawings | TBC (none referenced in source overview) |
| BoQ | n/a — day labour not BoQ-priced |
| Rate Build-up | Hus's `08 - Rates/Rate Cards` (friend-vault) |
| Pre-Pricing-Grill | n/a — day labour engagement |
| Letter of Offer | TBC |
| Tender Summary | n/a — day labour |
| Inclusions / Exclusions | TBC |
| Drawing Index | TBC |
| Final submitted total ex GST | n/a — day labour ongoing |
| Outcome | Ongoing — no payment claims yet submitted in source as of 2026-05-10 |

## For `lfo-precedent-finder`

Strong-match signals:
- HC = Ford Civil Pty Ltd
- Site type = TBC (Botany area — likely commercial/industrial slab or refurb; needs RFQ confirmation on next visit)
- Scope items = carpentry (formwork carpentry; concrete/steel-fix/curing not flagged in source)
- Design maturity = n/a (day-labour mode)
- Site postcode region = TBC (Botany ≈ 2019, ~10 km SW of Sydney CBD)

Weak-match signals (extract on deep-pass if precedent fires):
- Final submitted total ex GST — n/a (day-labour open-ended)
- Specific complexity factors applied — TBC
- LAFHA decision — n/a (Botany is the §13.1 LAFHA reference origin → almost certainly OUT)
- Adverse weather posture — n/a (day-labour: client wears it)
- Site exposure category — TBC (Botany Bay coastal proximity → coastal-air candidate)

## Open follow-ups

1. Confirm postcode + exact site address (Botany 2019 vs Banksmeadow 2019 vs Mascot 2020 boundary).
2. Identify end-client (council? developer? civil principal?).
3. Pull man-hours xlsx (`Ford - Botany Man Hours.xlsx`) when richer extraction needed — currently digest-only.
4. Determine site type for similarity scoring (commercial slab vs civil pit vs industrial).