---
job_no: TBC
project_code: TBC
job_name: MLP - 18 Argyle St
hc: MLP
end_client: TBC
site: 18 Argyle St (Sydney area — likely Argyle St The Rocks 2000, Parramatta 2150, or Hurstville 2220)
postcode: TBC (multiple Argyle St candidates in Sydney metro)
scope: carpentry (formwork carpentry — day labour / man hours billing)
design_maturity: TBC (day-labour mode)
outcome: in-progress
status: Ongoing
source: "[source: friend-vault] C:/Users/mclou/lfcs-precedent-staging/lfcs-obsidian-vault-mirror/01 - Jobs/MLP - 18 Argyle St/_Job Overview.md"
ingested: 2026-05-10 by lfcs-orchestrator (lfo-precedent-import)
purpose: Precedent reference for `lfo-precedent-finder` — carpentry day-labour, MLP HC
---

# MLP - 18 Argyle St

**Folder structure note:** Source is Hus's vault `01 - Jobs/` single-file shape. Sparse overview. MLP client carries red-flag (INV#960 overdue $15,063 + retention $8,690 held on INV#939 — both on different MLP job, 30 Glen St — but client-level payment behaviour material). `digest-only` mode per CLAUDE.md §3.1.

## Quick metadata

| Field | Value |
|---|---|
| HC | MLP (small HC — $14,620 8-mth day-labour revenue + $49,734 price-works active on sister job 30 Glen St; signed subcontract on 30 Glen St precedent) |
| End-client | TBC |
| Site | 18 Argyle St (city/suburb TBC) |
| Postcode | TBC |
| Project code | TBC |
| Scope | Carpentry works — man hours billing |
| Drawings | TBC |
| BoQ | n/a — day labour |
| Rate Build-up | Hus's `08 - Rates/Rate Cards` (friend-vault) |
| Pre-Pricing-Grill | n/a — day labour |
| Letter of Offer | TBC (sister job MLP - 30 Glen St has signed subcontract 09/10/2025; this job's contract status unclear) |
| Tender Summary | n/a |
| Inclusions / Exclusions | TBC |
| Drawing Index | TBC |
| Final submitted total ex GST | n/a — day labour ongoing |
| Outcome | Ongoing — no payment claims submitted on this job as of source mtime |

## For `lfo-precedent-finder`

Strong-match signals:
- HC = MLP (carries 🔴 payment-behaviour flag — overdue + retention on sister jobs)
- Site type = TBC (Argyle St in The Rocks 2000 = heritage CBD; Parramatta 2150 = CBD; Hurstville 2220 = suburban — very different precedent values)
- Scope items = carpentry
- Design maturity = n/a (day-labour mode)
- Site postcode region = TBC

Weak-match signals (extract on deep-pass if precedent fires):
- Final submitted total ex GST — n/a (day-labour open-ended)
- Specific complexity factors — TBC pending site disambiguation
- LAFHA decision — TBC pending postcode (most Argyle St candidates in metro = OUT)
- Adverse weather posture — n/a (day-labour)
- Site exposure category — TBC

## Open follow-ups

1. **Critical:** disambiguate 18 Argyle St location (The Rocks / Parramatta / Hurstville / other) — affects all site-type precedent matching.
2. Capture client risk profile from sister jobs (MLP - 30 Glen St + 199 Miller St) for HC-level red-flag inheritance — already 🔴 on payments.
3. Confirm contract type — day-labour only or hybrid lump-sum + day-labour?
4. Pull `MLP - 18 Argyl St Man Hours.xlsx` for richer extraction (note typo "Argyl" in filename — preserve verbatim if extracting).
