job_no: TBC
project_code: S01-2096-017
job_name: Solutions Plus - Jubilee Oval Upgrade
hc: Solutions Plus Built Pty Ltd
end_client: TBC (Glebe area — likely council)
site: Jubilee Oval / Glebe area, NSW
postcode: TBC (Glebe = 2037)
scope: formwork, steel-fix, concrete (FRP) — pits, kerb and gutter
design_maturity: TBC
outcome: in-progress (signed subcontract S01-2096-017; not yet claimed)
status: Ongoing
source: "[source: friend-vault] C:/Users/mclou/lfcs-precedent-staging/lfcs-obsidian-vault-mirror/01 - Jobs/Solutions Plus - Jubilee Oval Upgrade/_Job Overview.md"
ingested: 2026-05-10 by lfcs-orchestrator (lfo-precedent-import)
purpose: Precedent reference for `lfo-precedent-finder` — FRP concrete (pits + kerb-gutter) under Solutions Plus
---

# Solutions Plus - Jubilee Oval Upgrade

**Folder structure note:** Friend-vault source contains only a single `_Job Overview.md` index note. Pricing artefacts referenced (Job Tracker - Glebe.xlsx, Subcontract S01-2096-017.pdf, FRP Rates Development workbook) live in Hus's Windows folder and are not mirrored here.

## Quick metadata

| Field | Value |
|---|---|
| HC | Solutions Plus Built Pty Ltd |
| End-client | TBC (Glebe — typically Inner West / City of Sydney council patches) |
| Site | Jubilee Oval, Glebe NSW |
| Postcode | 2037 (assumed — Glebe) |
| Project code | S01-2096-017 (signed subcontract) |
| Scope | FRP concrete — pits, kerb and gutter |
| Drawings | not in mirror |
| BoQ | not in mirror |
| Rate Build-up | `Job Tracker - Glebe.xlsx` (in Hus's Windows folder) |
| Pre-Pricing-Grill | not in mirror |
| Letter of Offer | not in mirror |
| Tender Summary | not in mirror |
| Inclusions / Exclusions | not in mirror |
| Drawing Index | not in mirror |
| Final submitted total ex GST | TBC — not in `_Job Overview.md` |
| Outcome | in-progress (signed subcontract; PCs not yet submitted). POs raised: 20323708 (Jubilee Park patch), 20323709 (Homestead Park patch/cure) |

## For `lfo-precedent-finder`

Strong-match signals:
- HC = Solutions Plus Built Pty Ltd (Solutions Plus Group rate card V1.4 in force)
- Site type = pit + kerb-gutter (FRP under HC)
- Scope items = formwork + steel-fix + concrete (FRP)
- Design maturity = TBC
- Site postcode region = inner-west Sydney (2037)

Weak-match signals:
- Pit benchmarks: stormwater pit $10,770 each, culvert pit $16,830 each (per `08 - Rates/FRP Rates Development.md`, sheet "TCE Liv Stormwater pits"). Glebe-side pits likely sized differently — verify dimensions before reusing.
- Kerb-and-gutter: no Hus benchmark file extracted; reuse footpath 120mm rate (~$6,970 per 120m run) as a starting point for K&G linear pricing.
- Solutions Plus pays day-labour rate $85/hr per FRP Rates Development.md core rate.

## Open follow-ups

1. Pull final contract value + final submitted ex-GST from Subcontract S01-2096-017.pdf (Hus's Windows folder).
2. Confirm Jubilee Oval vs Homestead Park split — two separate POs raised against the same subcontract.
3. Capture pit dimensions if any pit pricing is included in the subcontract scope (currently only "pits" listed without dimensions).