job_no: 260119 (Hus's internal quote ref)
project_code: 260119R0
job_name: TCE Contracting - Light Horse Park Redevelopment
hc: TCE Contracting
end_client: TBC (Light Horse Park is in Liverpool LGA — likely Liverpool City Council)
site: Light Horse Park, Western Sydney NSW
postcode: TBC (Light Horse Park is at Moorebank/Liverpool — postcode 2170 likely)
scope: formwork, steel-fix, concrete (FRP) — footings + pad footings + various
design_maturity: Costin Roe drawings Issue 1, Dec 2025 (likely IFC or pre-IFC)
outcome: submitted (R0 + Amended Pad Footings revisions submitted; no PC raised; no contract noted)
status: Ongoing
source: "[source: friend-vault] C:/Users/mclou/lfcs-precedent-staging/lfcs-obsidian-vault-mirror/01 - Jobs/TCE Contracting - Light Horse Park Redevelopment/_Job Overview.md"
ingested: 2026-05-10 by lfcs-orchestrator (lfo-precedent-import)
purpose: Precedent reference for `lfo-precedent-finder` — TCE FRP footings + pad footings under Costin Roe design
---

# TCE Contracting - Light Horse Park Redevelopment

**Folder structure note:** Single `_Job Overview.md` in mirror. Pricing artefacts (`BOQ - Form work.xlsx`, `260119R0 LFCS Light Horse Park Redev - Rate Buildup.pdf`) live in Hus's Windows folder.

## Quick metadata

| Field | Value |
|---|---|
| HC | TCE Contracting |
| End-client | TBC (Liverpool City Council likely) |
| Site | Light Horse Park, Moorebank/Liverpool NSW |
| Postcode | 2170 (assumed) |
| Project code | 260119R0 (Hus quote-ref convention: YYMMDD + revision) |
| Scope | FRP concrete — footings, pad footings, various |
| Drawings | Costin Roe Consulting Engineers, Issue 1 (Dec 2025) — not in mirror |
| BoQ | `BOQ - Form work.xlsx` (Hus's Windows folder) |
| Rate Build-up | `260119R0 LFCS Light Horse Park Redev - Rate Buildup.pdf` (Hus's Windows folder) |
| Pre-Pricing-Grill | not in mirror |
| Letter of Offer | not in mirror |
| Tender Summary | not in mirror |
| Inclusions / Exclusions | not in mirror |
| Drawing Index | not in mirror |
| Final submitted total ex GST | TBC — not in `_Job Overview.md`; pull from Rate Buildup PDF |
| Outcome | submitted, awaiting decision. Multiple revisions including amended pad footings sent. No contract or PC raised yet. |
| Rate card | TCE Contracting V1.4 |

## For `lfo-precedent-finder`

Strong-match signals:
- HC = TCE Contracting
- Site type = footings + pad footings (FRP under TCE)
- Scope items = formwork + steel-fix + concrete
- Design maturity = IFC-adjacent (Costin Roe Issue 1, Dec 2025)
- Site postcode region = SW Sydney (2170 assumed)

Weak-match signals:
- Costin Roe Consulting Engineers as design house — useful pattern for next TCE bid checking design-maturity tier
- "Multiple quote revisions" + "amended pad footings" suggests TCE iterative pricing pattern (compare to Liverpool VAR-01 rebid behaviour)
- No final $ extracted — open follow-up

## Open follow-ups

1. Pull final submitted total + per-line rates from `260119R0 ... Rate Buildup.pdf`.
2. Capture footing dimensions (pad footing sizes — likely 1.5–2.5m sq based on park-redevelopment scale) for §13 pad-footing rule potential.
3. Capture concrete strength + supplier.
4. Capture reo intensity kg/m³.
5. Resolve postcode (Light Horse Park is at the Moorebank end of Liverpool LGA — confirm exact postcode).
6. Track award outcome — was the amended pad footings revision the final winning version?