job_no: 260209 (Hus quote-ref)
project_code: OCE13759 (Costin Roe / structural drawings ref) + 260209R0/R1 (Hus quote refs)
job_name: TCE Easter Creek (Eastern Creek Leachate Treatment Plant)
hc: TCE Contracting
end_client: TBC (likely Suez / Cleanaway / waste-management operator at Eastern Creek waste facility)
site: Eastern Creek Leachate Treatment Plant, NSW
postcode: 2766 (Eastern Creek)
scope: formwork, steel-fix, concrete (FRP) — slabs + footings per structural drawings
design_maturity: Civil + Structural CDC Rev 2 (under OCE13759 ref) — pre-IFC tendered design
outcome: submitted (R0 + R1 BOQ); no contract or PC raised yet
status: Ongoing
source: "[source: friend-vault] C:/Users/mclou/lfcs-precedent-staging/lfcs-obsidian-vault-mirror/01 - Jobs/TCE Easter Creek/_Job Overview.md"
ingested: 2026-05-10 by lfcs-orchestrator (lfo-precedent-import)
purpose: Precedent reference for `lfo-precedent-finder` — TCE FRP slabs + footings on water-treatment plant
---

# TCE Easter Creek (Eastern Creek Leachate Treatment Plant)

**Folder structure note:** Source folder is named "TCE Easter Creek" (likely typo for "Eastern Creek"). Pricing artefacts (R0 + R1 BOQ PDFs, rate breakup PDFs, formwork BOQ xlsx, cost summary, job tracker) live in Hus's Windows folder. Site is the Eastern Creek waste-management precinct in Western Sydney.

## Quick metadata

| Field | Value |
|---|---|
| HC | TCE Contracting |
| End-client | TBC (Eastern Creek Waste-Management Centre operator — Suez / Cleanaway / Veolia all operate facilities in the precinct) |
| Site | Eastern Creek Leachate Treatment Plant, NSW |
| Postcode | 2766 (Eastern Creek) |
| Project code | OCE13759 (structural design ref) + 260209R0/R1 (Hus quote refs) |
| Scope | FRP concrete — slabs, footings per structural drawings |
| Drawings | OCE13759 Civil + Structural CDC Rev 2 — not in mirror; in Hus's Windows folder |
| BoQ | `260209R0 ... FRP BOQ - Estimate.pdf` + `260209R1 ... FRP BOQ - Estimate.pdf` |
| Rate Build-up | `260209R0 ... FRP BOQ - Rate Breakup (1).pdf` + `260209R1 ... FRP BOQ - Rate Breakup.pdf` |
| Pre-Pricing-Grill | not in mirror |
| Letter of Offer | not in mirror |
| Tender Summary | `TCE_Eastern_Creek_Cost_Summary.xlsx` (Hus's Windows folder) |
| Inclusions / Exclusions | not in mirror |
| Drawing Index | not in mirror |
| Equipment estimate | Yes — separate equipment hire estimate prepared (referenced in `_Job Overview.md`) |
| Final submitted total ex GST | TBC — pull from Cost Summary xlsx |
| Outcome | submitted (R0 then R1 revision); no contract or PC raised |
| Rate card | TCE Contracting **V1.7 Eastern Creek** + V1.7 Equipment Eastern Creek (site-specific cards exist — confirms TCE has explicitly negotiated site-specific rates here, distinct from V1.4 general TCE card) |

## For `lfo-precedent-finder`

Strong-match signals:
- HC = TCE Contracting
- Site type = water/effluent-treatment plant slab + footings (FRP under TCE) — this is structurally adjacent to 2629 Erskine Park WWTP Slab and to other LFCS WWTP/leachate work
- Scope items = formwork + steel-fix + concrete (no curing line called out — likely covered separately or via supply-only)
- Design maturity = pre-IFC CDC Rev 2 (rev-D-style early tender)
- Site postcode region = Western Sydney (2766)

Weak-match signals:
- TCE Eastern Creek has its OWN rate card (V1.6 then V1.7) — distinct from general TCE V1.4. Means TCE has site-specific pricing for this end-client. Implication: when next TCE bid lands at Eastern Creek precinct, default to V1.7 cards, not V1.4.
- Equipment hire priced separately (not bundled into FRP rate) — suggests TCE Eastern Creek splits equipment as a separate cost line. May apply to any future leachate / WWTP TCE bid.
- R0 → R1 revision cycle typical of TCE pre-award negotiation pattern (also seen at Light Horse Park and Liverpool).

## Open follow-ups

1. Pull final R1 submitted total + per-line rates from R1 Rate Breakup PDF + Cost Summary xlsx.
2. Capture concrete strengths (leachate plants typically use 40-50MPa with sulphate-resistant cement — high spec).
3. Capture reo intensity kg/m³ — leachate plants usually very high (200-300 kg/m³ in walls).
4. Capture special exclusions list — leachate work typically excludes liner, hydrostatic testing, special coatings.
5. Track award outcome.
6. Compare R0 vs R1 to extract what TCE pushed back on (commercial posture intel for next round).
7. Cross-reference exposure category (likely "tidal" or "buried-aggressive" given leachate chemistry) — relevant to §13.7 site-exposure rule in `standing-context.md` once codified.