job_no: 2627
job_name: Airey Park — Homebush West
drawing_set: STR25020 rev D — Issued for Review 27.11.2025
designer: Capital Engineering Consultants (Parramatta)
spec_set: P171342-SP-001-0 rev 0 — Issued for tender 11.07.2025
spec_designer: Stellen Consulting (Manly), client Geoscape
extracted_at: 2026-05-08
authored_by: lfcs-pricing
session_id: 80b1f893-d887-4130-b96f-dd48d5450edd
phase: phase-3-worker
extraction_method: text + vision (Read tool, page-by-page; PDF rendering)
revision: 1
---

# 2627 — Drawing Index

## Structural drawings — STR25020 rev D (7 sheets)

| Sheet | Title | LFCS-relevant | Notes |
|---|---|---|---|
| S000 | General Notes | Yes (notes) | Concrete + reinforcement + formwork notes; AS3600/AS3610/AS1302 references; wind/earthquake design data; 80mm slump, 20mm max agg, Cement Type A; no penetrations >150mm Ø without approval; conduits >25mm Ø spaced ≥2× larger conduit dia from parallel; AS1170/AS1170.4 superimposed loads. Foundation notes: AS2870 H1, 210kPa stiff clay, 50mm blinding before reo, geotech S2348_GL_02_Rev0. Reinforcement: lap 40 bar dia (cog 300 typ). Masonry + Steelwork + Timber notes (NOT LFCS — masonry/structural-steel/carpentry subs). Brick lintel schedule (NOT LFCS). |
| S50 | Part Site Plan | Yes | Function room building footprint with existing slab + walls to remain (diagonal hatch); seating terrace at top-right; sandstone block retaining wall (NOT LFCS) refers to S51; tank + HC marks on plan. Architectural setout NOT shown — flag RFI for arch plan. |
| S51 | Seating Terrace Plan, Sections + Details | Yes | Seating terrace stepped SF1 strip footings (3 lifts visible), 150mm slabs (denoted), N12-200 horiz each face on terrace walls, 2N16-200 Z-bars 800 cog min in walls, N16-400 starter bars from SF1, sandstone block retaining wall (300×300×1000 long blocks) detail (NOT LFCS — masonry/specialist), waterproofing membrane + drainage gravel + 100Ø agg drain wrapped in geofabric (waterproofing NOT LFCS). Step + junction + corner reo details. Concrete quality table: pad/strip/slab on ground 32MPa, 80mm slump, 20mm agg, cement A. Cover schedule: strip footings 50/50/50 B1, internal slab 30/30/30 A1, external slab 40/40/40 A1. |
| S100 | Footing Plan | Yes | Grid A–F × 1–7. SF1 strip footings (450 wide × 500 deep, 4-F12 TM T&B + R10-600 ties, N16-400 vert starter bars lap 600) along top edge between gridlines 1-2 + side returns. SF2 strip footings (300 wide × 500 deep, 3-F12 TM T&B + R10-600 ties) at internal gridline 2 between C-E. Multiple internal walls (190mm block above + below + brick + existing-to-remain) with strip footings beneath — most internal block walls are masonry NOT LFCS, footings under masonry walls ARE LFCS. 88.9 dia × 6.0mm CHS galv steel posts above (NOT LFCS — structural steel). Step/junction/corner typical reo details. Notes: piering may be required (engineer to confirm during construction); steel connections + details to be finalised once roof beams approved; dial-before-you-dig. |
| S200 | Ground Floor Slab Plan | Yes | DEB1 drop edge beam along top edge between gridlines 1-2 (1200mm max deep × 300mm thick, 4F12 TM, N12-200 horiz, N12-300 horiz at base, continuous vapour proof membrane over 50mm sand bedding). 150mm slab on ground (internal areas) with SL82 T&B. 125mm pathway slab (external) with SL82 mesh top — note 4m max sawn control joint, max 10m keyed construction joint, max 20m expansion joint. Multiple [150] slab thickness markers on plan. SJ (sawn control joint) symbols around perimeter + internal at re-entrant corners — saw cut within 24 hours of pour. IJ (10mm polyethylene isolation joint) between walls/columns and new slab. Local removal of existing wall below to accommodate concrete riser. Level access between internal + external. Existing slab to remain (diagonal hatch). KJ keyed construction joint detail (paint first cast face with bitumen). Note 6: ALL EXPOSED SLAB TO BE WATERPROOFED BY APPROVED SYSTEM (NOT LFCS — waterproofing sub). Note 7: brick walls articulated, expansion joints 6000mm. 2N12-1200 long trimmer bars (TR) at openings. Typical re-entrant corner detail (cog 300 typ, 600 typ trimmer extension). |
| S201 | Ground Floor Slab Sections + Details | Yes | Section 1: existing slab to remain + tooth slab into existing slab/brick wall (TBC during construction); SF1 stepped (×2) supporting raised stair-landing with 150mm slabs at RL12.030/11.510/11.110; DEB1 at RL11.110 step. Section 2: existing slab + tooth stair into existing slab/brick wall + N12-200 top + bottom in stair, RLs 12.030/11.730/11.420/11.110/10.810. Section 3: small footing detail with N12-300 U-bars + N12-300 horiz bars. Existing slab saw cut detail: drill + epoxy N12-400 GALV dowel bars 150mm min into existing slab, 600 long into new slab; SL82 mesh top; "WATERSTOP BY OTHERS" (NOT LFCS). |
| S300 | Roof Framing Plan | **No — out of LFCS scope** | Steel beams (SB1 150 PFC galv, SB2 150 UC 37 galv), steel posts (SP 88.9Ø × 6.0 CHS galv), timber beams (TB1 2/150 × 63 Hyspan), timber rafters (R1 150 × 63 LVL @ 600 ctrs), pocket steel beam into existing brickwork (×4 locations), existing post retained between glazing, existing roof to remain. Steel post-to-beam connection details (2/4 M16 bolts typ, 10mm stiff plate). Multi-rib T-bar detail (brick composite beam). Beam bearing details (300×110×10 plate, 8mm CFW, 10 nom dry pack grout). Timber beam to brickwork connection (gang-nail tie-down strap 900 deep along existing brickwork). Beam + rafter span schedules. **Roof framing scope = structural-steel sub + carpenter; not LFCS.** |

## Pavement specification — P171342-SP-001-0 rev 0 (15 sections + 4 prelim pages)

| § | Title | LFCS-relevant | Notes |
|---|---|---|---|
| 1 | Introduction | Flag (template carry-over) | "Construction of the joint reinforced concrete pavement base for the pedestrian footpaths at **St Ives Showgrounds proposed carpark development**" — text references St Ives Showgrounds carpark. Different project. Template doc reused. RFI to designer requested to confirm intent. |
| 3 | Referenced Documents | Yes | AS1379, AS1478.1, AS2758.1, AS2870, AS3582 (parts 1+2+3), AS3600, AS3799 (curing compounds), AS3972, AS/NZS 3679.1, AS/NZS 4671. ASTM C171-07 sheet curing materials. |
| 4 | Materials | Yes (key conflict) | **TABLE 1: Pavement element "Base" → Strength Compressive 35 MPa, Flexural 4.5 MPa**, slump 80, max agg 20, max sublot 30m³ or one day's pour. Cement type, min cement content, max SCM, max w/c — all "to be nominated by Contractor." **Conflicts with structural drawings rev D S100/S200 concrete quality table → 32 MPa for slab on ground.** RFI required: which strength applies to 125mm pathway slab? Drawings call it slab-on-ground (32MPa); spec calls it pavement base (35MPa flexural-rated). Spec wins for pavement base by precedence if drawings ambiguous. Wax-based curing compounds NOT recommended (slippery); curing compound must comply AS3799 + tested. |
| 5 | Equipment | Indirect | LFCS provides own equipment. |
| 6 | Formwork | Yes | Steel or seasoned-dressed-timber planks with metal angle/channel along top edge, full base depth, 3mm/3m straightedge tolerance, 3mm vertical alignment from required level, 6mm form-face tolerance from alignment, stake max 1.5m apart. Form-removal 24 hrs minimum. Subbase 6.4 maintained smooth/compacted/dampened. |
| 8 | Placing + fixing reinforcement | Yes | AS3600 laps; chairs/spacers/stools metal/concrete/plastic only (no wood/aggregate/brick); placing tolerances per AS3600. |
| 9 | Placing, compacting + finishing | Yes (productivity-critical) | 24 hrs notice prior to pour. Concrete max 90 min from batching; truck temp 5–35°C; ambient <10°C or >30°C requires §13 precautions. Slump tolerance ±15mm at 80mm specified. Re-tempering only with approval per a–g protocol. **Min place rate 20 m³/hr** + plant/crew capable. >30 min interval = transverse construction joint. Compaction by internal vibrator + vibrating-beam screed (>200mm thick = vibrator first). Min 1 vibrator per 7 m³/hr placed + 1 standby. Float-screed-test 3m straightedge. Trowel (powered, after surface hard enough); broom texture across full width 500mm broom. |
| 10 | Curing | Yes | **Min 7-day cure** (NOT 14 — earlier assumption A7 in exclusions skeleton overstates; reduced to 7 days here). Initial wet curing within 3 hrs of finish OR strip. Methods: hessian moist + ponding, sprayed membrane (AS3799), or impermeable sheet (ASTM C171). Hessian must overlap ≥150mm. Sheet curing must overlap ≥500mm + tied/weighted. |
| 11 | Joints | Yes | All joint locations per drawings. Isolation/expansion: pre-formed filler, sealed top + edges, dowels per Cl 11.5. Contraction: weakened-plane or key, tooled OR sawn (3-5mm wide × ¼–⅓ depth) — saw-cut timing varies by ambient. Construction joints: at end of day or 30-min interruption. Dowels straight + parallel + tolerance ±10mm both directions; bonded-in or PVC sleeve to first-placed; 300mm clearance from transverse joint for round dowels (150mm for plate dowels). Joint sealant: clean groove, sealer flush or ≤5mm below surface. |
| 12 | Protection | Yes | 7 days minimum traffic exclusion; mats/plates/timbers if construction equipment crossing earlier; cleaning + barrier replacement same day. |
| 13 | Adverse weather | Yes | Hot weather (>30°C ambient, >35°C concrete): sprinkle forms/reo/subbase, shade aggregates, cool mix water, mid-day avoidance, aliphatic alcohol spray. **No concrete in rain; protect <24-hr concrete with waterproof covers.** |
| 14 | Testing + acceptance | Indirect | LFCS makes cylinders + delivers, mould 2 pairs cylinders per sublot (1 pair 7-day + 1 pair 28-day) per AS1012.7; **flexural beam test** per sublot (AS1012.1, RMS T304, AS1012.8 cure) — flexural testing rare for park pavement; **NATA lab cost via HC** per envelope item 28. Density check via cores 75–100mm Ø within 2 days — **destruct test invasive; HC/owner pays for core repair**, LFCS not responsible. Rejection: porosity, displaced reo, displaced cast-ins. |
| 15 | Construction tolerances | Yes | Surface flatness ≤5mm/3m. Thickness ±5mm tolerance from specified, else cores on 3m grid until conforming, replace deficient panels. Surface grinding limit 10% of panel area or 3% of total base area before remove-and-replace mandate. |

## Sheets NOT in this drawing set (RFIs)

- Architectural plans + setout + levels + falls — drawings note 9 (S100, S200) explicitly says "refer to architectural drawings for all setout, levels, falls etc." Architectural set NOT supplied. **Quantity take-off cannot be confirmed dimensionally without arch plan.** Provisional take-off uses visually-scaled estimates from S50/S100/S200 grid spacing — flagged in Bid Prep as primary RFI.
- Stormwater drainage drawings — note 5 (S200) refers for "location of pump well + sump pits". Sumps + waterstops + drainage are NOT LFCS but locations affect slab penetrations + trimmer bars for pricing.
- Geotech report S2348_GL_02_Rev0 — referenced but NOT in inbound set. Bearing capacity assumed per drawings note 1 (210 kPa stiff clay). Geotech read-through NOT required for first-pass take-off (founding-layer responsibility lies with HC + geotechnical engineer per drawings note 5).
- Shelter shop drawings (post footings) — referenced from S51 ("REFER TO SHELTER SHOP DRAWINGS FOR POST FOOTINGS") — NOT in this set. Post footings under seating-terrace shelter pavilion may be additional pad footings beyond S100. RFI required.

## Vision-extraction confidence per sheet

| Sheet | Text-pass extracted | Vision-pass needed | Confidence on key data |
|---|---|---|---|
| S000 | Yes | No (notes only, no plan) | High — notes clear |
| S50 | Partial — geometry only | Pending vision pass on dimensioned overlay | Low — no figured dims; relies on grid-scale-bar |
| S51 | Yes — sections + details | Vision pass useful for stepped-SF1 quantity-counting | Medium — visual count of stepped SF1 lifts |
| S100 | Partial — schematic clear, dims partial | Vision pass useful for grid spacing scaling | Medium — figured dims absent on this sheet (grid only) |
| S200 | Yes — slab thicknesses, joint symbols, schedules | Vision pass useful for slab-extent perimeter scaling | Medium — figured dims absent |
| S201 | Yes — RLs, sections | No additional vision needed | High — RLs explicit |
| S300 | Yes (out of scope) | n/a | High |

Vision-pass status: text-pass extraction sufficient for first-pass provisional take-off. **Architectural-plan RFI is the primary blocker, not vision-pass density.** Vision-pass on S100/S200 would refine perimeter lengths but cannot recover figured dimensions that are not on the sheet.