job_number: 2635
client: TCE
client_internal_ref: P424
end_client: TBC
designer: TBC (drawing ref NL251342_S, 90% DD pack)
project_name: Hammond Canal Bridge, Munmorah
site: Hammond Canal, Munmorah NSW (Central Coast)
status: bid-submitted-awaiting-response
type: subcontract-FRP-Package
contract_price: TBC (per Letter of Offer 2026-05-06)
hourly_rates_inherit: lfcs-standards/rate-card.md
client_signatory:
  name: Mohammed Selim
  role: Project Manager
  phone: TBC
  email: mselim@tcecontracting.com.au
related_job: 2602 (Dec Projects Munmorah Bridge — confirmed same physical job, different head contractor, 2026-05-14)
specifications: TBC (assume bridge-standard concrete spec + reo to AS 5100 / AS 3600)
standard_drawings: TBC (90% DD pack `NL251342_S__COMBINED_90DD.pdf`)
start_date: TBC
target_pc: TBC
bid_due: SUBMITTED 2026-05-06
created: 2026-05-14
created_by: cowork
---

# Job Brief — 2635 TCE — Hammond Canal Bridge (Munmorah)

## Status

LFCS submitted a **Letter of Offer** to TCE on **2026-05-06**. Awaiting TCE's response (acceptance / counter / further info).

ACROW formwork system quote received **2026-05-12** — this anchors the formwork productivity assumptions in the offer.

## Scope (1–3 sentences)

LFCS FRP Package subcontract on TCE's Hammond Canal Bridge job at Munmorah. Likely scope (verify against BOQ + drawings): **abutment walls** (formwork via ACROW panels-and-soldiers or Slims), **deck**, **walkway**. LFCS provides formwork erection + reo placement + concrete placement only — concrete + reo supply, traffic control, lighting, survey, crane (if needed beyond ACROW supply) assumed TCE or principal scope. Confirm against the TCE BOQ (P424-HCB-FRP-Package) and the executed Letter of Offer.

## Quantities at a glance (LFCS FRP scope, indicative — read BOQ to verify)

- Abutment walls: [TBC m² formwork, kg reo, m³ concrete — read BOQ]
- Deck slab: [TBC m² + kg + m³]
- Walkway: [TBC m + kg + m³]
- Programme: [TBC weeks/shifts]
- Crew: [TBC carps + steel fixers + concreters]

## Confirm with TCE before contract execution

1. **Bid status** — has TCE responded to the 2026-05-06 Letter of Offer? Verbal acceptance, written, or still negotiating?
2. **TCE bid contact / contract administrator** — who's the day-to-day for this job at TCE?
3. **End client** — Central Coast Council? TfNSW? Other?
4. **Start date / programme** — when do they want LFCS to mobilise?
5. **Specifications** — AS 5100 (bridges)? AS 3600 (concrete)? Project-specific concrete grade and slump?
6. **Concrete supply** — confirmed TCE scope? Which plant?
7. **Reo supply** — confirmed TCE scope? Pre-fab or stock?
8. **Site access / traffic management** — TCE scope?

## Possible cross-reference

`Upcoming/2602 - Dec Projects - Munmorah Bridge` is also a Munmorah Bridge job under a different head contractor (Dec Projects). Huss flagged this overlap in the 2626 brief on 2026-05-04. **Rocky to confirm whether 2635 (TCE) supersedes 2602 (Dec Projects) or runs in parallel** before reading 2602 as cross-reference.

Also: `Completed Jobs/TCE-242-HCB-Bridge` is a **prior** Hammond Canal Bridge job LFCS completed under TCE. **Read the lessons-learned and final variation register from TCE-242 before fine-tuning the 2635 position.**

## Risks / things to watch

1. **Bridge ≠ pit.** Different WHS profile: working at height, over water, traffic exposure. SWMS / rescue plan need to be bridge-specific (not just lifted from 2626 pit work).
2. **Over-water risk.** Hammond Canal. EPA approvals, marine ecology, tidal influence, fall-from-height-into-water rescue scenario.
3. **ACROW productivity assumptions** are baked into the LFCS Letter of Offer. If the ACROW quote scope changes, LFCS labour pricing may need revisiting.
4. **90% DD drawings** — not Issued for Construction. Quantities may shift on AfC release. Carry assumption clause in any post-award commitment.

## Documents in this folder (as of scaffold 2026-05-14)

- `02a/2635_Letter-of-Offer-LFCS-submission_2026-05-06.docx`
- `02b/2635_BOQ_P424-HCB-FRP-Package.xlsx` (TCE's BOQ)
- `02c/2635_ACROW_Formwork_Quote.pdf`
- `03a/2635_DWG_NL251342_S_COMBINED_90DD.pdf` (bridge structural drawings, 90% DD)
- `03b/2635_REF_Abutment-Wall-Formwork-Panels-and-Soldiers.pdf`
- `03b/2635_REF_Abutment-Wall-Formwork-Slims.pdf`
- `03b/2635_REF_Walkway-Types-Example.pdf`