# Scope Benchmarks — Append-only Log

- 2026-05-06 — cowork (HQ-side, post Friend-Vault-Audit) — INDEX + 6 scope buildups seeded from Hasibul Khan's `08 - Rates/FRP Rates Development.md` — sources: Stormwater Pit, Culvert Pit, Lightpole Footing (TCE Livingstone) · Stair Flight, Footpath 120mm, Footpath 160mm (Solutions Plus Hornsby) — labour rate basis $85/hr ordinary confirmed consistent with Rate Card V1.7
