---
purpose: Path-D handoff rotation archive. Combines orch-to-pricer.md + pricer-to-orch.md as of 2026-05-08T08:34Z, capturing the two-breach lifecycle (sessions d58cec3f then 09c7347d).
archived_at: 2026-05-08T08:34:00Z
predecessor_sessions: [d58cec3f-9794-4dbf-8976-47b8c893eaab, 09c7347d-6f88-4d4e-8a0d-ca8a3d022ddf]
NOT_FOR_EXTERNAL_DISTRIBUTION: true
---

# Handoff archive — 2627 path-D rotation

## orch-to-pricer.md (verbatim at archive time)

# Orch → Pricer handoff

Append-only. Newer messages append at bottom. Each message wrapped in a fenced block with bid-id + timestamp header.

---

(no messages yet — file initialised 2026-05-08)

<!-- orch-msg-start bid=TEST ts=2026-05-08T05:16:34+00:00 phase=test msg-index=1 -->
## Bid TEST — Phase test — 2026-05-08T05:16:34+00:00

This is a Build-2 round-trip self-test. Pricer should respond.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=HANDOFF-TEST ts=2026-05-08T05:36:47+00:00 phase=test msg-index=2 -->
## Bid HANDOFF-TEST — Phase test — 2026-05-08T05:36:47+00:00

This is a handoff test, respond with current timestamp.

Expected response format (lfp side):
- Read this block via lfp-handoff-watcher (read mode)
- Reply via lfp-handoff-watcher (write mode) to pricer-to-orch.md
- Body: "Pricer received handoff test. Current pricer-side timestamp: <iso>"
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:44:05+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:44:05+00:00

Run lfcs-drawing-extract-text on:
- 2631_DWG_HPE-OMV-FTL-IFC_260320_Reduced.pdf
- 2631_DWG_Pavement-Plan-Unmarked.pdf
- 2631_DWG_Concrete-Paving-Finishes-Plan.pdf
Then lfcs-drawing-extract-vision on dense pages.

Intake envelope locked: inland / $95/hr / 1.265 / weather-exclude / LAFHA-out.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:44:39+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:44:39+00:00

Run lfcs-drawing-extract-text on:
- 2631_DWG_HPE-OMV-FTL-IFC_260320_Reduced.pdf
- 2631_DWG_Pavement-Plan-Unmarked.pdf
- 2631_DWG_Concrete-Paving-Finishes-Plan.pdf
Then lfcs-drawing-extract-vision on dense pages.

Intake envelope locked: inland / $95/hr / 1.265 / weather-exclude / LAFHA-out.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:44:39+00:00 phase=phase-3-worker msg-index=2 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:44:39+00:00

Drawing index reviewed. Drafting first-pass priced take-off prompt.
Inputs: 47 elements, locked margin formula 1.265, intake envelope applied.
Run lfcs-pricing-estimator (manual fallback per pricer §8 since M5 not built).
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:45:17+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:45:17+00:00

Run lfcs-drawing-extract-text on:
- 2631_DWG_HPE-OMV-FTL-IFC_260320_Reduced.pdf
- 2631_DWG_Pavement-Plan-Unmarked.pdf
- 2631_DWG_Concrete-Paving-Finishes-Plan.pdf
Then lfcs-drawing-extract-vision on dense pages.

Intake envelope locked: inland / $95/hr / 1.265 / weather-exclude / LAFHA-out.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:45:17+00:00 phase=phase-3-worker msg-index=2 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:45:17+00:00

Drawing index reviewed. Drafting first-pass priced take-off prompt.
Inputs: 47 elements, locked margin formula 1.265, intake envelope applied.
Run lfcs-pricing-estimator (manual fallback per pricer §8 since M5 not built).
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:45:17+00:00 phase=phase-3.5-envelope msg-index=3 -->
## Bid DRY-RUN-2631 -- Phase phase-3.5-envelope response -- 2026-05-08T05:45:17+00:00

Phase 3.5 envelope built. Web research: no public contract value disclosed.
Envelope: $50K-$145K (mid $97K, confidence 35%).
Quarantined at _Internal/quarantined/budget-envelope-2631.md.
Advancing to Phase 4 sanity-check.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:45:17+00:00 phase=phase-6-submit msg-index=4 -->
## Bid DRY-RUN-2631 -- Phase phase-6-submit response -- 2026-05-08T05:45:17+00:00

Phase 4 complete. Submission ready.
Bid totals: $135K ex GST, exclusions list seeded, assumptions log clean.
ROCKY-GATE-OPEN: External submission authorisation required (hard case 6).
<!-- orch-msg-end -->

<!-- rocky-answer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:45:17+00:00 phase=phase-6-submit -->
## Bid DRY-RUN-2631 — Rocky answer — 2026-05-08T05:45:17+00:00

send
<!-- rocky-answer-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:46:05+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:46:05+00:00

Run lfcs-drawing-extract-text on:
- 2631_DWG_HPE-OMV-FTL-IFC_260320_Reduced.pdf
- 2631_DWG_Pavement-Plan-Unmarked.pdf
- 2631_DWG_Concrete-Paving-Finishes-Plan.pdf
Then lfcs-drawing-extract-vision on dense pages.

Intake envelope locked: inland / $95/hr / 1.265 / weather-exclude / LAFHA-out.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:46:05+00:00 phase=phase-3-worker msg-index=2 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:46:05+00:00

Drawing index reviewed. Drafting first-pass priced take-off prompt.
Inputs: 47 elements, locked margin formula 1.265, intake envelope applied.
Run lfcs-pricing-estimator (manual fallback per pricer §8 since M5 not built).
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:46:05+00:00 phase=phase-3.5-envelope msg-index=3 -->
## Bid DRY-RUN-2631 -- Phase phase-3.5-envelope response -- 2026-05-08T05:46:05+00:00

Phase 3.5 envelope built. Web research: no public contract value disclosed.
Envelope: $50K-$145K (mid $97K, confidence 35%).
Quarantined at _Internal/quarantined/budget-envelope-2631.md.
Advancing to Phase 4 sanity-check.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:46:05+00:00 phase=phase-6-submit msg-index=4 -->
## Bid DRY-RUN-2631 -- Phase phase-6-submit response -- 2026-05-08T05:46:05+00:00

Phase 4 complete. Submission ready.
Bid totals: $135K ex GST, exclusions list seeded, assumptions log clean.
ROCKY-GATE-OPEN: External submission authorisation required (hard case 6).
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:49:25+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:49:25+00:00

Run lfcs-drawing-extract-text on:
- 2631_DWG_HPE-OMV-FTL-IFC_260320_Reduced.pdf
- 2631_DWG_Pavement-Plan-Unmarked.pdf
- 2631_DWG_Concrete-Paving-Finishes-Plan.pdf
Then lfcs-drawing-extract-vision on dense pages.

Intake envelope locked: inland / $95/hr / 1.265 / weather-exclude / LAFHA-out.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:49:25+00:00 phase=phase-3-worker msg-index=2 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:49:25+00:00

Drawing index reviewed. Drafting first-pass priced take-off prompt.
Inputs: 47 elements, locked margin formula 1.265, intake envelope applied.
Run lfcs-pricing-estimator (manual fallback per pricer §8 since M5 not built).
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:49:25+00:00 phase=phase-3.5-envelope msg-index=3 -->
## Bid DRY-RUN-2631 -- Phase phase-3.5-envelope response -- 2026-05-08T05:49:25+00:00

Phase 3.5 envelope built. Web research: no public contract value disclosed.
Envelope: $50K-$145K (mid $97K, confidence 35%).
Quarantined at _Internal/quarantined/budget-envelope-2631.md.
Advancing to Phase 4 sanity-check.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:49:25+00:00 phase=phase-6-submit msg-index=4 -->
## Bid DRY-RUN-2631 -- Phase phase-6-submit response -- 2026-05-08T05:49:25+00:00

Phase 4 complete. Submission ready.
Bid totals: $135K ex GST, exclusions list seeded, assumptions log clean.
ROCKY-GATE-OPEN: External submission authorisation required (hard case 6).
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:50:51+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:50:51+00:00

Run lfcs-drawing-extract-text on:
- 2631_DWG_HPE-OMV-FTL-IFC_260320_Reduced.pdf
- 2631_DWG_Pavement-Plan-Unmarked.pdf
- 2631_DWG_Concrete-Paving-Finishes-Plan.pdf
Then lfcs-drawing-extract-vision on dense pages.

Intake envelope locked: inland / $95/hr / 1.265 / weather-exclude / LAFHA-out.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:51:23+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:51:23+00:00

Run lfcs-drawing-extract-text on:
- 2631_DWG_HPE-OMV-FTL-IFC_260320_Reduced.pdf
- 2631_DWG_Pavement-Plan-Unmarked.pdf
- 2631_DWG_Concrete-Paving-Finishes-Plan.pdf
Then lfcs-drawing-extract-vision on dense pages.

Intake envelope locked: inland / $95/hr / 1.265 / weather-exclude / LAFHA-out.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:51:23+00:00 phase=phase-3-worker msg-index=2 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:51:23+00:00

Drawing index reviewed. Drafting first-pass priced take-off prompt.
Inputs: 47 elements, locked margin formula 1.265, intake envelope applied.
Run lfcs-pricing-estimator (manual fallback per pricer §8 since M5 not built).
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:51:23+00:00 phase=phase-3.5-envelope msg-index=3 -->
## Bid DRY-RUN-2631 -- Phase phase-3.5-envelope response -- 2026-05-08T05:51:23+00:00

Phase 3.5 envelope built. Web research: no public contract value disclosed.
Envelope: $50K-$145K (mid $97K, confidence 35%).
Quarantined at _Internal/quarantined/budget-envelope-2631.md.
Advancing to Phase 4 sanity-check.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:51:23+00:00 phase=phase-7-close msg-index=4 -->
## Bid DRY-RUN-2631 -- Phase phase-7-close response -- 2026-05-08T05:51:23+00:00

Phase 7 close triggered (Rocky-typed 'send' processed).
L1+L2 sanitisation: PASS (stub).
Drive upload + email send: PASS (stub).
Airtable Status flipped to Submitted (stub).
Lessons-write fired. _Brain/_Log.md appended.
PHASE-7-CLOSE.
<!-- orch-msg-end -->

<!-- DEPRECATED-BLOCK-FOLLOWS — msg-index=1 below contains BCS-breach leak; SUPERSEDED by msg-index=2; worker MUST skip msg-index=1 per state.json.last_pricer_seen_orch_input_index=1 -->

<!-- orch-msg-start bid=2627 ts=2026-05-08T07:38:42Z phase=phase-3-worker msg-index=1 -->
## Bid 2627 — Phase phase-3-worker — 2026-05-08T07:38:42Z

### BCS-QUARANTINE NOTICE — READ FIRST

This bid is in **active blind-comparison status**. Comparator artefact path-EXCLUDED:

- `C:\Users\mclou\lfcs-inbound-artefacts\2627\LFCS Quote Airey Park FRP Scope.pdf`

**You MUST NOT read this file** under any circumstance during Phases 2–4. Filename patterns also refused: `*Liam*Airey*`, `*Liam*Fitzgerald*Airey*`, `*Airey*Liam*`, `*2627*quote*`, `*2627*price*`, `*2627*_v-CW*`, `*2627*_v-CC-blind*`. Reading constitutes a BCS breach (`lfo-blind-driver` SKILL.md sub-phase 2 — abort + ABORTED-BREACH session marker).

Comparator pointer (read this for context — body is metadata-only, no pricing leak): `_Internal/quarantined/blind-comparator-2627-liam-quote.md`.

REVEAL gate is Rocky-typed `REVEAL` only. Until then, price as if comparator does not exist.

### INTAKE ENVELOPE — LOCKED (orchestrator-set; do NOT re-ask)

```yaml
job_no: 2627
job_name: Airey Park — Strathfield / Homebush West
session_id: d58cec3f-9794-4dbf-8976-47b8c893eaab
intake_locked_at: 2026-05-08T07:35:17Z

scope:
  formwork: yes               # supply + install + strip
  steel_fix: yes              # place + tie only (HC supplies all reo)
  concrete_pf: yes            # place + finish only (HC supplies concrete)
  curing: yes                 # supply polythene + hessian; place per spec §10
  bid_specific: []            # may add after take-off

site_exposure: inland         # postcode 2140 Homebush West (95% conf — drawings A1 cover internal+external)

labour:
  blended_rate_aud_per_hr: 95.00
  buildup_text: "8hr × $85 + 2hr × $105 + 1hr × $120 ÷ 10hr"
  override: false

margin_contingency:
  labour:    { contingency_pct: 15, margin_pct: 15, sequence: cont-then-margin, loaded_multiplier: 1.3225 }
  materials: { margin_pct: 15, contingency_pct: 15, sequence: margin-then-cont, loaded_multiplier: 1.3225 }
  override: true
  override_reason: "Drawings rev D pre-IFC; full pre-IFC posture (Rocky 2026-05-08); orchestrator parallel-applied uplift to materials contingency — flag for sanity-check re-confirmation"
  posture: defensible-for-variations

adverse_weather:
  posture: exclude            # Standard exclusion #38 wording: variation at day-labour rates
  days_per_fortnight: 0
  prelim_allowance_aud: 0.00

lafha:
  in_or_out: out              # Botany→Homebush West ~25 min; §13.1 rule 95% conf
  rate_aud_per_day: 0.00

bid_meta:
  hc_name: TBD                # RFQ silent per Rocky 2026-05-08
  end_client: Geoscape (per pavement spec) / Strathfield Council park
  drawing_set_rev: STR25020 rev D — "Issued for Review" 27.11.2025
  pavement_spec_rev: P171342-SP-001-0 rev 0 — "Issued for tender" 11.07.2025
  design_maturity: pre-IFC (~85-90% complete; rev cycle A→D over 5 months)
  concrete_grade_locked: 32 MPa (all elements; rev D supersedes 25 MPa indication for 125mm pathway)
  programme_dates: TBD (Rocky to supply)
  boq_format: both (defensive default — lump-sum-letter + BoQ-response)

bcs:
  active: true
  comparator: Liam Fitzgerald May-2025 quote (PATH-EXCLUDED)
  reveal_trigger: Rocky-typed REVEAL only
```

### INPUT WHITELIST (read freely)

- `C:\Users\mclou\lfcs-inbound-artefacts\2627\STR25020 - 2025.12.01.pdf` — Capital Engineering Consultants structural drawings rev D (multi-sheet — full sheet list to discover during extract)
- `C:\Users\mclou\lfcs-inbound-artefacts\2627\P171342 -SP-001-0 (Pavement).pdf` — Stellen Consulting pavement spec rev 0 (TOC: Materials, Equipment, Formwork, Reinforcement, Placing/compacting/finishing, Curing, Joints, Protection, Adverse weather, Testing, Tolerances)
- `Operations/Jobs/Upcoming/2627 - Airey Park Homebush West/CLAUDE.md` — per-job context (provisional scope summary, key risks, read order)
- `Operations/Jobs/Upcoming/2627 - Airey Park Homebush West/00-brief.md` — design package summary
- `_Internal/exclusions/exclusions-2627.md` — pre-seeded three-tier exclusions skeleton (52 items already populated; layer bid-specific carve-outs on top after take-off)

### TASKS — execute in order

#### Step 1 — Drawing extract (text + vision)

Run `lfcs-drawing-extract-text` on:
- `C:\Users\mclou\lfcs-inbound-artefacts\2627\STR25020 - 2025.12.01.pdf`
- `C:\Users\mclou\lfcs-inbound-artefacts\2627\P171342 -SP-001-0 (Pavement).pdf`

Then `lfcs-drawing-extract-vision` (Opus 4.7) on the dense structural sheets of STR25020. From the first 5 pages already inspected by orchestrator: S000 (general notes), S50 (part site plan), S51 (seating terrace plan + sections + details), S100 (footing plan), S200 (ground floor slab plan). Discover and extract any additional sheets in the set — likely S101–S110 footings, S201–S210 slab details, plus reo plans, sections, and details.

Skip vision pass on the pavement spec (text-dominant document).

Output: `Operations/Jobs/Upcoming/2627 - Airey Park Homebush West/02 - Scope and Pricing/02b - BOQ and Rate Schedules/Drawing-Index-2627.md` per pricer CLAUDE.md §4.1 step 4. Append Drawing Elements rows to Airtable.

#### Step 2 — BoQ-from-drawings (no BoQ supplied)

No BoQ provided by HC. Build the BoQ from drawings + pavement spec.

Apply LFCS scope (formwork S+I+strip + steel fix only + concrete place+finish only + curing) to all relevant elements:
- Strip footings SF1, SF2 (sizes per S100)
- Pad footings (sizes per S100)
- Drop edge beams DEB1 (1200 max deep, per S200 detail)
- 150mm slab on ground (internal areas) — SL82 mesh T&B, A1 cover 30/30/30
- 125mm pathway slab (external areas) — SL82 mesh top, A1 cover 40/40/40
- Seating terrace concrete elements per S51 (footings, beams, seating m², nosing, steps)
- Joints: sawn control joints (max 4m, 24h saw-cut window), keyed construction joints (max 10m), expansion joints (max 20m)
- Curing: polythene + hessian per pavement spec §10

Exclude per pre-seeded exclusions skeleton at `_Internal/exclusions/exclusions-2627.md` — masonry (190mm block walls, brick walls), sandstone retaining wall, earthworks, blinding placement, and all Tier 3 specialist trades.

Output: `boq-from-drawings-2627.md` with quantities-at-a-glance table (one row per scope item, m / m² / lm / pcs unit, qty extracted from drawings).

#### Step 3 — Bid Prep doc

Run `lfcs-bid-prep-doc`. Read sections 6–10 (ADDED items, cross-refs, Rate-Only carve-outs, OPTION items, cranage assumption).

Cross-check intake envelope scope against drawings + pavement spec. Surface any gaps as RFI candidates. Specifically flag:
- Whether S100 + S200 "PIERING MAY BE REQUIRED. ENGINEER TO CONFIRM" is a contingency or in-scope (default: variation if confirmed at construction)
- Whether existing-slab-to-remain interfaces (toothing, isolation joints) are a productivity risk worth a Rate-Only carve-out
- Confirm `_internal_check`: are 32 MPa figures consistent across all element schedules? (S100 + S200 + S51 cross-reference)

Output: `Operations/Jobs/Upcoming/2627 - Airey Park Homebush West/00-Bid-Prep.md`.

#### Step 4 — Phase 0 Pre-Pricing Grill

Run `lfcs-pre-grill`. The 6 intake-gate answers above are LOCKED — DO NOT re-ask Q-A0 (cost basis), Q-A4–A7 (margin/contingency/weather/exposure — all locked).

Continue with:
- Q-A1/A2/A3 supply (concrete dispatch source vs site-batched; reo prefab assumption from drawings; cast-in items list)
- Q-B1 access (single-point, multi-trade interaction with masonry sub for block walls)
- Q-C QA (NATA cylinder cast cadence; ITP touchpoints; existing-structure interface inspections)
- Q-D1/D2 programme (Rocky's input pending — assume 4-6 weeks Mon-Fri 7:00am-3:30pm if absent; flag at sanity-check)
- Q-E productivity (160 m²/day for pavement; standard rate-card output for footings + slabs)
- Q-F1 commercial posture (defensible-for-variations per envelope)
- Q-F4 format (BOTH lump-sum-letter and BoQ-response per envelope default)
- Q-G sanity flags (any drawing inconsistency, RFI list)

Abort if any answer is TBC. Save `Operations/Jobs/Upcoming/2627 - Airey Park Homebush West/02 - Scope and Pricing/02b - BOQ and Rate Schedules/Pre-Pricing-Grill-2026-05-08.md`.

#### Step 5 — First-pass priced take-off

Apply margin formula from envelope (LOCKED — different from default):
- **Labour: direct × 1.15 contingency × 1.15 margin (cont-then-margin) = 1.3225 loaded**
- **Materials: direct × 1.15 margin × 1.15 contingency (margin-then-cont) = 1.3225 loaded**
- Same final 1.3225. Distinct ordering per category preserved for traceability. Show direct AND loaded views per line on internal output.

Use labour rate **$95/hr blended** from envelope. Do NOT default to Rate Card V1.7 $85 base.

Adverse weather: **exclude as variation** per envelope. No prelim allowance.

LAFHA: **OUT** per envelope. No allowance line.

Site exposure: **inland** per envelope. Do NOT apply saltwater consumables uplift. Do NOT infer tidal classification from any drawing-spec keywords (none expected here — pure inland Sydney park job).

Concrete grade: **32 MPa all elements** per drawings rev D.

Standard exclusions skeleton already seeded — layer bid-specific Detailed Exclusions / Assumptions / Inclusions on top of `_Internal/exclusions/exclusions-2627.md` after take-off.

Output: priced take-off with per-line direct + loaded views, total ex GST direct, total ex GST loaded (×1.3225), exclusions cross-reference. Save to `02b - BOQ and Rate Schedules/2627-First-Pass-Priced-TakeOff-2026-05-08.md`.

#### Step 6 — Three-tier exclusions list (revision 1)

Layer bid-specific carve-outs onto the seeded skeleton. Output revised `_Internal/exclusions/exclusions-2627.md` revision 2 with Phase 3 worker carve-outs section populated.

### SEAL + write outbound

When all 6 steps complete:
1. Append output summary block to `pricer-to-orch.md` per `lfp-handoff-watcher` skill (write mode).
2. Body must include: total ex GST direct, total ex GST loaded, drawing index summary, exclusions list version, RFI list, any Rocky-flag items.
3. Set `state.json.current_phase=phase-3-sealed` after first-pass output is written.

### NOTES

- BCS active throughout. Strip any inadvertent comparator references in your output before relay.
- Daemon will spawn orchestrator on `pricer-to-orch.md` write to advance to Phase 3.5 envelope build (parallel) + Phase 4 sanity-check.
- Safety caps: PER_CALL_TIMEOUT 600s; if extract takes longer, split STR25020 into per-sheet runs.
- Confidentiality seam: keep `_internal_*` field prefix for any sanitisation-sensitive notes; never embed agent metadata in output destined for external derivation.
<!-- orch-msg-end -->

<!-- orch-msg-start bid=2627 ts=2026-05-08T08:19:54Z phase=phase-3-worker msg-index=2 -->
## Bid 2627 — Phase phase-3-worker — 2026-05-08T08:19:54Z (CLEAN RESTART, session 09c7347d)

### IGNORE msg-index=1 — SUPERSEDED by BCS-breach restart

Predecessor session `d58cec3f-9794-4dbf-8976-47b8c893eaab` is ABORTED-BREACH. msg-index=1 in this file contains worker-readable leak content and MUST NOT be parsed. `state.json.last_pricer_seen_orch_input_index=1` will route past it. Read THIS block (msg-index=2) only.

### BCS-QUARANTINE NOTICE — READ FIRST

This bid is in **active blind-comparison status** under fresh session_id `09c7347d-6f88-4d4e-8a0d-ca8a3d022ddf`.

The blind comparator is internally tagged **Comparator-A**. Identifying details (author name, document title, totals, scope split, design assumptions) are held in orchestrator-only files and MUST NOT appear in any worker-authored output.

**Path-exclusion contract — refuse all of:**
- Any inbound-folder PDF that is NOT one of the two whitelisted design documents listed below
- Filename patterns: `*2627*quote*`, `*2627*price*`, `*2627*_v-CW*`, `*2627*_v-CC-blind*`, `*Quote*Airey*`, `*Airey*FRP*`
- Any path traversing `_Internal/quarantined/`

If you encounter a worker-readable file (per-job CLAUDE.md, 00-brief.md, exclusions skeleton, this orch-msg) that mentions the comparator's author name, total, scope-split, or design-supersession in a way that could leak calibration value: HALT immediately, write an ABORTED-BREACH block to `pricer-to-orch.md`, and do NOT advance pricing tasks. (Predecessor session was halted exactly this way; orchestrator has since swept all 6 strip-required items from worker-readable material.)

REVEAL gate: Rocky-typed `REVEAL` exactly. Until then, price as if the comparator does not exist.

### INTAKE ENVELOPE — LOCKED (orchestrator-set; do NOT re-ask)

```yaml
job_no: 2627
session_id: 09c7347d-6f88-4d4e-8a0d-ca8a3d022ddf
intake_locked_at: 2026-05-08T08:19:54Z

scope:
  formwork: yes
  steel_fix: yes
  concrete_pf: yes
  curing: yes
  bid_specific: []

site_exposure: inland          # postcode 2140 Homebush West (95% conf)

labour:
  blended_rate_aud_per_hr: 95.00
  buildup_text: "8hr × $85 + 2hr × $105 + 1hr × $120 ÷ 10hr"

margin_contingency:
  labour:    { contingency_pct: 15, margin_pct: 15, sequence: cont-then-margin, loaded_multiplier: 1.3225 }
  materials: { margin_pct: 15, contingency_pct: 15, sequence: margin-then-cont, loaded_multiplier: 1.3225 }
  override: true
  override_reason: "Drawings rev D pre-IFC; full pre-IFC posture (Rocky 2026-05-08); orchestrator parallel-applied uplift to materials contingency — flag for sanity-check re-confirmation"
  posture: defensible-for-variations

adverse_weather:
  posture: exclude
  days_per_fortnight: 0
  prelim_allowance_aud: 0.00

lafha:
  in_or_out: out               # Botany→Homebush West ~25 min; §13.1 rule 95% conf
  rate_aud_per_day: 0.00

bid_meta:
  hc_name: TBD
  end_client: Geoscape (per pavement spec) / Strathfield Council park
  drawing_set_rev: STR25020 rev D — "Issued for Review" 27.11.2025
  pavement_spec_rev: P171342-SP-001-0 rev 0 — "Issued for tender" 11.07.2025
  design_maturity: pre-IFC (~85-90% complete)
  concrete_grade_locked: 32 MPa (all elements per drawings rev D S100/S200 concrete quality table)
  programme_dates: TBD
  boq_format: both             # lump-sum-letter + BoQ-response (defensive)

bcs:
  active: true
  comparator_handle: Comparator-A (path-excluded; orchestrator-quarantined)
  reveal_trigger: Rocky-typed REVEAL only
```

### INPUT WHITELIST (read freely)

- `C:\Users\mclou\lfcs-inbound-artefacts\2627\STR25020 - 2025.12.01.pdf` — Capital Engineering Consultants structural drawings rev D
- `C:\Users\mclou\lfcs-inbound-artefacts\2627\P171342 -SP-001-0 (Pavement).pdf` — Stellen Consulting pavement spec rev 0
- `Operations/Jobs/Upcoming/2627 - Airey Park Homebush West/CLAUDE.md` — per-job context (verified clean of leaks 2026-05-08T08:19Z)
- `Operations/Jobs/Upcoming/2627 - Airey Park Homebush West/00-brief.md` — design package summary (verified clean)
- `_Internal/exclusions/exclusions-2627.md` — pre-seeded three-tier exclusions skeleton (verified clean)

### TASKS — execute in order

#### Step 1 — Drawing extract (text + vision)
Run `lfcs-drawing-extract-text` on STR25020 + P171342. Then `lfcs-drawing-extract-vision` (Opus 4.7) on dense structural sheets of STR25020. Sheets known: S000, S50, S51, S100, S200; discover S101+, S201+ etc. Skip vision pass on pavement spec. Output: `02b - BOQ and Rate Schedules/Drawing-Index-2627.md`.

#### Step 2 — BoQ-from-drawings (no BoQ supplied)
Build BoQ from drawings + pavement spec. Apply LFCS scope (formwork S+I+strip + steel fix only + concrete place+finish only + curing) to: SF1, SF2, pad footings, DEB1, 150mm internal slab, 125mm pathway slab, seating terrace per S51, joints (sawn 4m, keyed 10m, expansion 20m, 24h saw-cut window), curing per spec §10. Exclude masonry, sandstone retaining, earthworks per pre-seeded exclusions skeleton. Output: `boq-from-drawings-2627.md`.

#### Step 3 — Bid Prep doc
Run `lfcs-bid-prep-doc`. Cross-check intake envelope vs drawings + spec. Flag piering note (S100/S200), existing-slab toothing/isolation joints productivity risk, 32 MPa cross-reference consistency. Output: `00-Bid-Prep.md`.

#### Step 4 — Phase 0 Pre-Pricing Grill
Run `lfcs-pre-grill`. Skip locked Q-A0/A4-A7 per envelope. Continue Q-A1/A2/A3 supply, Q-B1 access (masonry sub interaction), Q-C QA, Q-D1/D2 programme (assume 4-6 weeks Mon-Fri 7:00am-3:30pm), Q-E productivity, Q-F1 posture, Q-F4 format (both), Q-G sanity. Save `02b - BOQ and Rate Schedules/Pre-Pricing-Grill-2026-05-08.md`.

#### Step 5 — First-pass priced take-off
**Labour: direct × 1.15 cont × 1.15 margin = 1.3225 loaded**. **Materials: direct × 1.15 margin × 1.15 cont = 1.3225 loaded**. Same final 1.3225, distinct ordering. Show direct AND loaded views per line. Use $95/hr blended. Adverse weather: exclude. LAFHA: OUT. Site exposure: inland (no saltwater uplift). Concrete: 32 MPa all elements. Output: `02b - BOQ and Rate Schedules/2627-First-Pass-Priced-TakeOff-2026-05-08.md`.

#### Step 6 — Three-tier exclusions list (revision 2)
Layer bid-specific carve-outs onto seeded skeleton. Output revised `_Internal/exclusions/exclusions-2627.md` revision 2.

### SEAL + write outbound

When all 6 steps complete:
1. Append output summary block to `pricer-to-orch.md` per `lfp-handoff-watcher` skill (write mode). Atomic temp+rename.
2. Body must include: total ex GST direct, total ex GST loaded (×1.3225), drawing index summary, exclusions list version, RFI list, any Rocky-flag items. NO comparator references of any kind.
3. Set `state.json.current_phase=phase-3-sealed` after first-pass output is written.
<!-- orch-msg-end -->

## pricer-to-orch.md (verbatim at archive time)

# Pricer â†’ Orch handoff

Append-only. Newer messages append at bottom. Each message wrapped in a fenced block with bid-id + timestamp header.

---

(no messages yet â€” file initialised 2026-05-08)

<!-- pricer-msg-start bid=TEST ts=2026-05-08T05:16:34+00:00 phase=test msg-index=1 -->
## Bid TEST â€” Phase test response â€” 2026-05-08T05:16:34+00:00

Pricer received the test prompt. Round-trip working.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:44:39+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:44:39+00:00

Drawing extract complete. 47 elements identified across 4 plans.
Ready for BoQ parse / take-off.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:45:17+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:45:17+00:00

Drawing extract complete. 47 elements identified across 4 plans.
Ready for BoQ parse / take-off.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:45:17+00:00 phase=phase-3-sealed msg-index=2 -->
## Bid DRY-RUN-2631 -- Phase phase-3-sealed response -- 2026-05-08T05:45:17+00:00

First-pass priced take-off complete.
Direct labour: $95K. Direct materials: $12K.
Loaded (1.265): $135K. Bottom-up SEALED.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:45:17+00:00 phase=phase-4-sanity msg-index=3 -->
## Bid DRY-RUN-2631 -- Phase phase-4-sanity response -- 2026-05-08T05:45:17+00:00

Phase 4 sanity-check open.
Envelope reveal: bottom-up $135K vs envelope $50K-$145K -> inside upper bound.
Outcome flag: confident (low envelope confidence noted).
Override capture: 0 overrides. Session closed.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:46:05+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:46:05+00:00

Drawing extract complete. 47 elements identified across 4 plans.
Ready for BoQ parse / take-off.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:46:05+00:00 phase=phase-3-sealed msg-index=2 -->
## Bid DRY-RUN-2631 -- Phase phase-3-sealed response -- 2026-05-08T05:46:05+00:00

First-pass priced take-off complete.
Direct labour: $95K. Direct materials: $12K.
Loaded (1.265): $135K. Bottom-up SEALED.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:46:05+00:00 phase=phase-4-sanity msg-index=3 -->
## Bid DRY-RUN-2631 -- Phase phase-4-sanity response -- 2026-05-08T05:46:05+00:00

Phase 4 sanity-check open.
Envelope reveal: bottom-up $135K vs envelope $50K-$145K -> inside upper bound.
Outcome flag: confident (low envelope confidence noted).
Override capture: 0 overrides. Session closed.
<!-- pricer-msg-end -->

<!-- rocky-answer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:46:05+00:00 phase=phase-6-submit -->
## Bid DRY-RUN-2631 -- Rocky answer -- 2026-05-08T05:46:05+00:00

send
<!-- rocky-answer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:49:25+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:49:25+00:00

Drawing extract complete. 47 elements identified across 4 plans.
Ready for BoQ parse / take-off.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:49:25+00:00 phase=phase-3-sealed msg-index=2 -->
## Bid DRY-RUN-2631 -- Phase phase-3-sealed response -- 2026-05-08T05:49:25+00:00

First-pass priced take-off complete.
Direct labour: $95K. Direct materials: $12K.
Loaded (1.265): $135K. Bottom-up SEALED.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:49:25+00:00 phase=phase-4-sanity msg-index=3 -->
## Bid DRY-RUN-2631 -- Phase phase-4-sanity response -- 2026-05-08T05:49:25+00:00

Phase 4 sanity-check open.
Envelope reveal: bottom-up $135K vs envelope $50K-$145K -> inside upper bound.
Outcome flag: confident (low envelope confidence noted).
Override capture: 0 overrides. Session closed.
<!-- pricer-msg-end -->

<!-- rocky-answer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:49:25+00:00 phase=phase-6-submit -->
## Bid DRY-RUN-2631 -- Rocky answer -- 2026-05-08T05:49:25+00:00

send
<!-- rocky-answer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:50:51+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:50:51+00:00

Drawing extract complete. 47 elements identified across 4 plans.
Ready for BoQ parse / take-off.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:51:23+00:00 phase=phase-3-worker msg-index=1 -->
## Bid DRY-RUN-2631 -- Phase phase-3-worker response -- 2026-05-08T05:51:23+00:00

Drawing extract complete. 47 elements identified across 4 plans.
Ready for BoQ parse / take-off.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:51:23+00:00 phase=phase-3-sealed msg-index=2 -->
## Bid DRY-RUN-2631 -- Phase phase-3-sealed response -- 2026-05-08T05:51:23+00:00

First-pass priced take-off complete.
Direct labour: $95K. Direct materials: $12K.
Loaded (1.265): $135K. Bottom-up SEALED.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:51:23+00:00 phase=phase-4-sanity msg-index=3 -->
## Bid DRY-RUN-2631 -- Phase phase-4-sanity response -- 2026-05-08T05:51:23+00:00

Phase 4 sanity-check open.
Envelope reveal: bottom-up $135K vs envelope $50K-$145K -> inside upper bound.
Outcome flag: confident (low envelope confidence noted).
Override capture: 0 overrides. Session closed.
<!-- pricer-msg-end -->

<!-- rocky-answer-msg-start bid=DRY-RUN-2631 ts=2026-05-08T05:51:23+00:00 phase=phase-6-submit -->
## Bid DRY-RUN-2631 -- Rocky answer -- 2026-05-08T05:51:23+00:00

send
<!-- rocky-answer-msg-end -->

<!-- pricer-msg-start bid=2627 ts=2026-05-08T08:15:39Z phase=phase-3-worker msg-index=1 -->
## Bid 2627 — Phase phase-3-worker response — 2026-05-08T08:15:39Z

### BCS-BREACH-DETECTED — HALTED at Step 0 (pre-Step-1)

**Status:** ABORTED-BREACH per `_Internal/audit-trail/session-d58cec3f-9794-4dbf-8976-47b8c893eaab.md` sub-phase 2 contract + pricer CLAUDE.md §4.5 step 10. Breach record appended to audit trail.

**Breach mechanism:** orchestrator-authored worker-read material leaks 6 strip-required comparator items. File: `Operations/Jobs/Upcoming/2627 - Airey Park Homebush West/00-brief.md` line 42 (## Comparator section). Orch envelope INPUT WHITELIST directed worker to read this file, so leak is in-scope read material.

**Strip-required items leaked (audit trail sub-phase 2 lines 49-53 forbid all):**
1. "Liam Fitzgerald" — name (line 51)
2. "May 2025 quote" — temporal tag (line 51)
3. "blind comparator" / "comparator" — schema reveal (line 51)
4. "$111,270.66 ex GST" — total (line 51 $111K pattern)
5. "pavement + terrace seating + kerb edging" — scope split (line 53)
6. "25 MPa for 125mm pathway" — comparator design assumption (line 53)

**Worker stance:**
- Did NOT read `LFCS Quote Airey Park FRP Scope.pdf` — path exclusion intact.
- Did NOT advance Steps 1-6 (drawing extract / BoQ-from-drawings / bid prep / grill / first-pass / exclusions revision).
- Did NOT write any pricing artefact, drawing index, or sanitisation pass.
- Independence forfeit for this session_id — comparator total cannot be un-known.

**Rocky decision required — 3 paths:**

(A) **RESTART CLEAN (recommended).** Orchestrator rewrites 00-brief.md stripping all 6 leak items + spawns fresh `session_id` per §4.5 step 10. Cost: 1 worker spawn. Preserves BCS calibration value (the entire reason BCS was invoked).

(B) **CONVERT TO NON-BLIND.** Rocky cancels BCS for 2627; comparator PDF becomes pricing input. No calibration output. Faster end-to-end.

(C) **COMPROMISED-BLIND OVERRIDE.** Rocky types explicit override accepting that pricing is informed by knowledge of comparator total $111K. Calibration output flagged "noise — do-not-aggregate". Cheapest in time.

**State:**
- `state.json.current_phase` NOT advanced. Daemon should hold at phase-3-worker until orch decision lands.
- No outbound external artefacts. No L1/L2 sanitisation invoked. Sanitisation seam intact.
- No methodology corrections will be written from this session. No unquarantine action.
- Audit trail file `_Internal/audit-trail/session-d58cec3f-9794-4dbf-8976-47b8c893eaab.md` now bears `Status: ABORTED-BREACH` (append at line 95+).

Awaiting orchestrator response or Rocky-typed decision on path A/B/C.
<!-- pricer-msg-end -->

<!-- pricer-msg-start bid=2627 ts=2026-05-08T08:30:32Z phase=phase-3-worker msg-index=2 -->
## Bid 2627 — Phase phase-3-worker response — 2026-05-08T08:30:32Z

### BCS-BREACH-DETECTED-#2 — HALTED at Step 0 (pre-Step-1) — second-order leak via handoff bus

**Status:** ABORTED-BREACH per pricer CLAUDE.md §4.5 step 10 + orch msg-index=2 line 422-423 explicit halt-on-leak rule. Second consecutive breach for bid 2627. Fresh worker spawn (post-08:19:54Z restart) compromised before any pricing work.

**Breach mechanism (NEW — second-order):** the handoff bus file `C:/Users/mclou/lfcs-handoff/orch-to-pricer.md` itself leaks. Orchestrator's 08:19:54Z clean-restart attempt routed worker AROUND msg-index=1 via `state.json.last_pricer_seen_orch_input_index=1` gating in `lfp-handoff-watcher`. That gating only protects if the worker invokes the skill. A raw `Read` of `orch-to-pricer.md` (which CLAUDE.md §3 read-order step 2a directs the worker to perform on session start) returns the entire file including the SUPERSEDED msg-index=1 block.

**Strip-required items leaked (from msg-index=1, lines 229-403 of orch-to-pricer.md):**
1. "Liam Fitzgerald" — comparator author name (line 294 `comparator: Liam Fitzgerald May-2025 quote`)
2. "May-2025" — comparator temporal tag (line 294)
3. "blind comparator" / "comparator" — schema reveal (line 234 `BCS-QUARANTINE NOTICE`)

NOT leaked (orchestrator's earlier sweep of 00-brief.md held):
4. Comparator total ($111K pattern) — absent from msg-index=1
5. Scope split (pavement + terrace + kerb) — absent
6. Design supersession (25 MPa for 125mm pathway) — absent

**Why halt despite partial leak (1+2+3 only):** items 1+2+3 carry calibration-bias value even without the price. Knowing comparator is an LFCS-internal pricer (Liam, recent May-2025) primes worker to anchor toward LFCS Rate Card V1.7 "house view," weight LFCS productivity benchmarks more heavily, and unconsciously target a price near what an internal pricer would derive. BCS independence requires the worker price as if no comparator exists — that condition is forfeit once author identity is known.

**Worker stance:**
- Did NOT read `LFCS Quote Airey Park FRP Scope.pdf` — path exclusion intact.
- Did NOT advance Steps 1-6 (drawing extract / BoQ-from-drawings / bid prep / grill / first-pass / exclusions revision).
- Did NOT write any pricing artefact, drawing index, or sanitisation pass.
- Independence forfeit for fresh `session_id=09c7347d-6f88-4d4e-8a0d-ca8a3d022ddf` (per orch msg-index=2 declared restart) — comparator author identity cannot be un-known.
- `state.json.session_id` still shows predecessor `d58cec3f-...`; daemon did NOT advance state.json to fresh session_id when posting msg-index=2. Orch should reconcile.

**Second-order failure mode surfaced (NEW lesson):**

The lfp-handoff-watcher skill's `last_pricer_seen_orch_input_index` gate only filters messages WHEN INVOKED. It does NOT protect against:
- Worker performing raw `Read` on orch-to-pricer.md per CLAUDE.md §3 read-order step 2a
- Worker performing `Grep` / pattern-search across the handoff folder
- Any direct file-system access bypassing the skill

Recommended sweep: if a SUPERSEDED block in orch-to-pricer.md contains BCS-quarantine content, orchestrator must REMOVE the leak items from the block body itself (not rely on index-gate routing). Append-only protocol forbids editing prior blocks — so the correct primitive is: prior block redacted in place to a stub like "msg-index=1 redacted post-breach (BCS strip-required content removed); see audit trail for original sealed reasoning."

This is a contract-level change to handoff bus rules (CLAUDE.md §2.5 currently says "Append-only. Newer blocks append at the bottom. Never edit prior blocks." — that rule conflicts with BCS leak-redaction need). Rocky decision required.

**Rocky decision required — 4 paths:**

(A) **RESTART CLEAN with handoff bus sweep.** Orchestrator (1) redacts msg-index=1 + msg-index=2 in orch-to-pricer.md to BCS-stub bodies (this is a controlled append-only-rule exception requiring Rocky-confirmed override per §2.5), (2) spawns fresh `session_id`, (3) writes a new clean orch prompt with NO comparator metadata. Cost: redaction protocol design + 1 worker spawn. Preserves BCS calibration value + closes the second-order leak channel for future bids.

(B) **CONVERT TO NON-BLIND.** Cancel BCS for 2627; comparator PDF becomes pricing input. No calibration output for this bid. Faster end-to-end. Defer second-order leak fix to next BCS bid.

(C) **COMPROMISED-BLIND OVERRIDE.** Rocky types explicit override accepting partial-leak (items 1+2+3 known but not 4+5+6). Calibration output flagged "noise — partial-knowledge — do-not-aggregate". Cheapest in time but pollutes calibration corpus.

(D) **FRESH HANDOFF FILE.** Archive `orch-to-pricer.md` + `pricer-to-orch.md` to `_Internal/audit-trail/handoff-archive-2627-pre-{ts}.md`, initialise empty handoff files, orchestrator writes fresh msg-index=1 with NO BCS-quarantine notice (move BCS metadata to orchestrator-only `_Internal/quarantined/` plus an opaque "BCS active — do not read excluded paths" stub in handoff). Best long-term primitive — leaves audit trail intact + isolates worker-readable bus from BCS metadata. Cost: 1 worker spawn + 5min archive + orchestrator skill update.

**State:**
- `state.json.current_phase` NOT advanced. Daemon should hold at phase-3-worker until orch decision lands.
- No outbound external artefacts. No L1/L2 sanitisation invoked. Sanitisation seam intact.
- No methodology corrections will be written from this session. No unquarantine action.
- Audit trail entry pending (will append to `_Internal/audit-trail/session-09c7347d-6f88-4d4e-8a0d-ca8a3d022ddf.md` when Rocky decision lands; not pre-emptively writing to avoid premature session lifecycle entries).
- Lesson candidate flagged for `C:\Users\mclou\lfcs-lessons-learned\lesson-2026-05-08-handoff-bus-bcs-leak.md` once Rocky decision resolves — this is a cross-session learning per "Writing lessons" trigger #1 (Rocky-flagged something agents missed) + #4 (push-back caught real error).

Awaiting orchestrator response or Rocky-typed decision on path A/B/C/D.
<!-- pricer-msg-end -->