# Work Log - 2026-02-06

## Job Details
- **Location:** Arncliffe, Sydney
- **Company:** Ford Civil
- **Crew:** Michael + Mike (German lad)
- **Foreman:** Demo (?)
- **Start:** 7:00am
- **Engineer:** Passed ✓

## 12:37 - Concrete Pour #1
- **Activity:** Concrete poured
- **Photo:** Footing with electrical conduits (orange corrugated, yellow caps)
- **Notes:** Conduits capped, rebar visible, manhole cover nearby

## 12:37 - Concrete Pour #2
- **Activity:** Concrete poured
- **Photo:** Shallow patch with two orange conduits, crossed braces
- **Notes:** Braces holding conduits, survey flags visible

## 12:39 - Concrete Pour #3
- **Activity:** Concrete poured
- **Photo:** Square wooden form with two orange conduits
- **Notes:** Metal stakes bracing form, orange barriers in background

## 12:40 - Concrete Pour #4
- **Activity:** Concrete poured
- **Photo:** Small square footing with two conduits
- **Notes:** Bucket with trowel nearby, tools visible

## 12:41 - Concrete Pour #5
- **Activity:** Concrete poured
- **Photo:** Shallow patch with looped orange conduit
- **Notes:** Conduit loop emerging from slab

## 12:42 - Concrete Pour #6
- **Activity:** Concrete poured
- **Photo:** Oval patch with single vertical conduit (blue cap)
- **Notes:** No shutters

## Summary
- **Pace:** Flat out morning
- **Issues:** Had to fix heights engineer forgot
- **Result:** All concrete in on time ✓
- **Total pours:** 7 (5 without shutters, 2 with shutters)

## Afternoon Plan
- Tidy up area
- Pack up the ute
- Stripping pedestals (different location on site)

## 14:00 - Afternoon Update
- **Status:** Wrapping up cleanup (~10 mins left)
- **Next:** Moving to other work area for stripping

## 14:00 - Boss's Concrete (for reference)
- **Done by:** Boss
- **Photo:** Footing with rebar cage, 4 anchor bolts (yellow caps)
- **Notes:** Different style - exposed rebar cage, anchor bolts

---

*Pending sync to Notion - need API key configured*