## Strategic Thinking (18:25 AEDT)
Phase 1A of Control Centre real data wiring is complete, proving the architecture. However, we're bottlenecked on Michael's physical input for grants and lead outreach. To prevent fleet deadlock on single points of failure, I need to push Susan toward automated drip campaigns that require fewer manual touchpoints, and have Harper draft generic LOIs for Michael to simply sign rather than waiting for his raw text.
