# Construction Glossary (learned from Rocky)

*Updated as Michael corrects me. These are steelfixing/formwork terms.*

| Term | What It Is | Context |
|------|-----------|---------|
| Links | Steel reinforcement links (stirrups/ligatures) | "Drop 2 links" = install link bars |
| Conduits | Electrical conduit pipes embedded in concrete | "Position conduits" = place for electricians |
| Cages | Pre-assembled reinforcement steel cages | Lowered into position before pour |
| Shutters | Formwork panels that hold concrete shape | "Build 2 shutters" = assemble formwork |
| Aids | Foundation elements / pile caps | Work done on aids = pile cap reinforcement |
| Pour | Concrete placement | "Concrete at 11" = pour scheduled for 11am |
| White Card | Safety induction card (mandatory for all site workers in AU) |
| Edge of kerb | Reference line/level from groundworks crew |
| EDM | Electronic Distance Measurement (surveying tool) |
| Pedestals | Concrete columns with holding down bolts |
| Day work | Work paid by the day (not piece rate) |