# Cron Job: lfcs-eod-summary

**Job ID:** efcdb9a95299
**Run Time:** 2026-04-29 17:01:57
**Schedule:** 0 17 * * *

## Prompt

[IMPORTANT: You are running as a scheduled cron job. DELIVERY: Your final response will be automatically delivered to the user — do NOT use send_message or try to deliver the output yourself. Just produce your report/output as your final response and the system handles the rest. SILENT: If there is genuinely nothing new to report, respond with exactly "[SILENT]" (nothing else) to suppress delivery. Never combine [SILENT] with content — either report your findings normally, or say [SILENT] and nothing more.]

EOD summary for Rocky on Hornsby (active job). Read todays diary file in 07d Daily Diary/. Read 07a Dockets/ — was todays docket photographed Y/N. Read Job-Tracker.md hours and materials added today. Reply with a tight 5-7 line summary on Telegram: hours logged today, photos saved, docket status (CRITICAL: flag if missing), materials in, tomorrows plan, anything to chase. If docket missing: highlight in red text and remind that no signed docket = no invoice line.

## Response

🔧 **EOD 2026-04-29 — 01-2275 HPE Field of Play Hornsby:**
• Diary: 1 entry — pre-mobilisation day, no crew on site
• Hours: None — Day 0 admin day, Job-Tracker rows empty
• Materials in: None
• Photos: 0
• Docket: N/A — no site work today, starts tomorrow 30 April
• Tomorrow: **Day 1 — mobilise + HammerTech inductions** (10 Cat A RFIs still pending response from Solutions Plus — chase before site starts)
• RFIs: 10 Cat A pending — Alvey/Joel needs to answer before Day 1 kicks off

No signed docket expected today (pre-mob). **Docket rule kicks in from 30 April.**