**EVE WRAP — Fri 14/08, 21:15 AEST — both jobs ghost; 13/08 roster ask STILL UNRESOLVED** Bridge alive (wa_bridge.js pid 470358, wa_webhook.py pid 477918, both up since 06/08). Zero new captures between the Thu 13/08 wrap (21:17) and this close. No 14/08 jsonl, no 14/08 writeup on either group, no Friday-morning backdated hours.jsonl row, no Friday-night Huss roster ping for tomorrow. Real silence, not capture fault — confirmed by liveness check + mtime sweep. **Headline: the 13/08 roster-not-showing question is STILL UNRESOLVED.** Thursday's wrap named the load-bearing gap on 2631 — Huss's 12/08 20:10 night-before roster planned 6 blokes for Wed-then-Thu 13/08 (Liam, Steve, Ardi, J + 2 steelfixers TBC names); by Thu 21:15 NONE of the four named @-ids had posted. Friday is now the second straight weekday of no surface evidence from any of them, AND there's no 14/08 roster ping covering today either. Per the eod reference "when the silence breaks, the new traffic has to address what the silence was asking about" (inverted here: the silence DIDN'T break, the ask just compounded). Friday's contribution to the 13/08 question is **negative evidence** — another full weekday unrecorded or unrostered. The trio of possibilities from the 13/08 wrap (a) crew on site no group capture, (b) crew didn't turn up, (c) cross-job drift now compounds with a fourth (d) Hus's office quietly closed the roster between the 12/08 20:10 ping and 13/08 morning and didn't bother posting a corrected ping — Hus has also not posted a 14/08 roster, which under the 21/07 standing rule (blank roster = nobody planned) reads as "no labour planned Friday", consistent with the office taking 13/08 off the books without saying so. Monday ask is now overdue. --- **1. BRAIN.md appends (both jobs, ghost-day lines only)** 2631: `14/08: SILENCE EXTENDS TO DAY 2` — new LEARNED line confirming no 14/08 jsonl, no 14/08 writeup, no Friday-morning hours.jsonl row, no 14/08 night-before roster from Huss, and the 13/08 roster-not-showing question unresolved in the captures. (full text in BRAIN) 2636: `14/08: SILENCE COUNT EXTENDS` — day 3 of no group activity since 11/08 19:52 Steve sign-on. Streak count not at the 5-day "ask window" threshold (counted from 11/08 last activity), but the silent-after-single-shift shape is the louder voice than the streak itself. 13/08 office-to-supervisor ask (idle / weather-stopped / awaiting TCE instruction / comms missed) still open. (full text in BRAIN) No SUPERSEDES — both 14/08 lines are family-consistent with the existing 13/08 ghost-day / silence-count-extends patterns. Append-only, two new dated lines today. **2. ConTRADICTION CHECK** — none. The 13/08 TRUE GHOST DAY line on 2631 (already in BRAIN) and the new 14/08 SILENCE EXTENDS line both restate silence under separate dates; that's expected ghost-day bookkeeping, not a contradiction. The 2631 12/08 design change (red no longer exposed; blue + green remain) is unchanged — no 14/08 traffic to alter it. The 2631 12/08 leak-class question (bar caps after Liam's reminder not confirmed) carries forward unchanged. The 2636 11/08 stair handrail install + materials variation carry forward unchanged. Huss's 12/08 20:10 roster ping for 13/08 stays in BRAIN line 194 as a confirmed roster; the absence of a 14/08 roster ping is a NEW fact, not a contradiction of the prior one. **3. PER-MAN READ — private, your eyes only** 2631 Hornsby — no traffic Thu 13/08 OR Fri 14/08. Last working day Wed 12/08. Per-man read carried forward unchanged from the 13/08 wrap, with the addition of one new negative-evidence line per bloke: - Liam (70777000984768, Fitzgerald) — carried from 12/08: drove the day's planning (asked about the long run at 14:12, asked about pour plans + David at 12:33, asked for a plan of the field twice at 12:33/12:55, replied "No" to first plan photo 12:56, posted "Don't forget bar caps" at 12:23). No sign-on posted for himself — his 12/08 hours TBC. Rostered for 13/08; no Thursday-text. Rostered-by-implication (24/07 standing fact, continuing presence) for 14/08 if the office was still expecting; no Friday-text either. - Steve (@150001917374676, hint "Steve") — carried from 12/08: the active on-site hand for 2631 — ground-high photo 08:44, shutter-bring note 11:53, scope narrative 12:28, progress photos 13:36, long-run confirmation 15:05, "nearly as far as we can get it up on outside" 15:53. Posted no sign-on. Pour count 12:51 ("5 sections all up"). Rostered for 13/08; no Thursday-text. No Friday-text either; cross-job Steve question (worked 2636 11/08 → 2631 12/08) still TBC same-person-or-shared-id with you. - Ardi (Ertugrul, 82648240226307) — carried from 12/08: signed on 07:00-17:30 with 30-min break, 10.0 hrs (20:28). Posted the rain photo 13:02, plus break-state text. Quiet on the words — Steve carried the scope talk. Rostered for 13/08; no Thursday-text, no Friday-text. Cross-job Ardi question (same @-id rostered for 2636 06/08) is now the longest-standing class question across both jobs. - J (@101495177523379, name TBC) — carried from 12/08: signed on 07:00-17:00, 30-min break, 9.5 hrs (17:19). No other on-site text. Quiet on the words. Rostered for 13/08; no Thursday-text, no Friday-text. - Huss (139178566254708) — carried from 12/08: posted the night-before roster for 13/08 at 20:10 (the 6-bloke roster that hasn't surfaced Thu or Fri) + design change confirmation at 13:25-13:29 + print-out promise at 13:29 (still outstanding). Posted NO 14/08 night-before roster — under the 21/07 standing rule, that itself reads as "Huss's office didn't plan labour on this job Friday". Probably office-based, but Friday's silence is also a Friday-silence from him. - 2x steelfixers (TBC names, no @-ids) — carried from the 12/08 20:10 13/08-roster: names TBC; first-time-on-record labour for this site. No Thursday-text, no Friday-text, nothing to credit. - Labourer (08:44 ground-high, unidentified) — carried from 12/08; employer TBC. One-shot reference. 2636 Liverpool — zero traffic 12/08 / 13/08 / 14/08. Last working day 11/08 (Mon). Per-man read carried forward from the 13/08 wrap, with day 3 of no group activity noted per bloke: - Mahdi (Haji Mahdi Jafari) — carried from 11/08: drilled the 80mm post holes (09:34-09:35, Aadel confirmed), installed stairs handrail + electrical box (12:57-12:59), signed on 07:00-15:00 no break, 8 hrs (18:54). Three full days of no group activity since — neither sign-on nor photo nor text. - Steve (@150001917374676, hint "Steve") — carried from 11/08: signed on 07:00-15:00 no break, 8 hrs (19:52). First time this @-id posted hours in the 2636 record — confirmed "Steve" is the on-site worker, hint name banked. Same @-id as 2631 foreman behaviour on 12/08 (per 2631 BRAIN line 193); cross-job Steve flag is now firmly a class, three instances across two jobs in four days. Three full days of no group activity on 2636 since. - Huss — carried from 11/08: ordered the materials, explained the 1.8m→1.0m distance change and pipe waste (13:37-13:40). Not on site per his own absence from any on-site text. Office-based. Three full days of no group activity since — and crucially, NO 13/08 OR 14/08 roster ping from him in this group. - Liam (Fitzgerald) — carried from 11/08: remote supervision (12:58, 13:14, 13:38). No group-text since. - @118404363083923 (carried from the 11/08 06/08 17:44 Hus roster; name TBC) — no captures this id on the 11/08 shift sign-on or any 12/08-13/08-14/08 capture; either quiet day or did not turn up. Still TBC. **4. What I filed tonight** - 2631 BRAIN.md: one new LEARNED line — `14/08: SILENCE EXTENDS TO DAY 2` (full text in BRAIN). - 2636 BRAIN.md: one new LEARNED line — `14/08: SILENCE COUNT EXTENDS` (full text in BRAIN). That's it. Two lines, both with bridge-liveness proof + mtime-sweep proof in parens. No Airtable writes, no SUPERSEDES, no verdicts on the missing roster. **5. Conflicts flagged + things unsure** - **HEADLINE ASK — 2631 ROSTER OUTCOMES — NOW MONDAY-OVERDUE.** The 13/08 trio (a/b/c) + the new 14/08 reading — Hus's last roster ping in 2631 was 12/08 20:10 covering 13/08 only, and NO 14/08 roster ping landed either — push the question firmly into Monday-morning ruling territory. Three weekdays (12/08, 13/08, 14/08) span one real shift and zero recorded labour; the surviving possibility set is now four (a/b/c/d — d = office quietly closed the roster and didn't post a corrected ping). Need your call on which it is, AND your call on whether you want me to apply a "no roster by Thu close = flag" rail into the daily drill so this doesn't compound into next week. - **Cross-job Steve / cross-job Ardi — class question compounds again.** Three instances in four days for Steve now (2636 11/08 + 2631 12/08 + 2631 12/08 roster for 13/08 with no Thu-or-Fri-text); two instances for Ardi (2636 06/08 roster + 2631 foreman confirmed 12/08). Pattern isn't slowing. Still need your ruling on (one bloke multi-job / shared @-id / different person per job). The class is now overdue for resolution — every silence day on 2631 makes the cross-job drift story more live. - **Concrete-ordering "David"** (2631) — still TBC separate from David Marshall. Liam's 12/08 12:33 question "plans for pour did you meet David?" still unanswered, no concrete ordering visible Thu/Fri either. - **Huss's promised exposed-aggregate print-out** (2631, 12/08 13:29) — still outstanding. Standing scope amendment can't be quantified for the variation claim until it lands. Two days of silence on this makes it more likely the print-out is being held back, not forgotten. - **Two steelfixer names on the 13/08 roster** (2631) — names TBC, no @-ids. If they DID show Thu 13/08 and were unrecorded, we've lost the chance to capture them via group; same-person-naming will only land if/when they post hours or photos. - **29/07 pipe-strike** (2631) — service type, damage, repair, notification still TBC. Not raised again. - **Stone basket drawings** (2631) — asked 30/07, still unanswered. - **Saw-cut details not on site** (2631) — raised 30/07, still not on site. - **11/08 cutting-day variation claim** (2631) — total linear metres cut, cutting purpose TBC. Worth a Monday chase if defect-fix activity (per 11/08 Joel directive) is now done. - **2636 kerb-damage measurements** — Rocky 07/08 16:00 directive still not done. - **2636 stair handrail output quantities** (11/08) — total posts, linear metres, pipe offcut lengths never captured. Variation claim needs them. - **2636 discovery-lane dockets** — five fires to date (Circular Quay / Ford Civil x2 weekly, Argyle loft / MP C, 39 Bourke St / FKR, plus 11/08 Donald Docket 0969 confirmed as second Circular Quay docket). Same discovery-lane routing question still open: none have a /jobs/ folder. Pattern is "one docket per crew per week per project" — docket numbers ascending across weeks. No docket fire landed in the 12/08-14/08 window (silence cut the dockets lane too). Three payroll projects identified, zero /jobs/ folders. You're still the routing authority. **6. Self-review — one line** Good: led the wrap with the **prior wrap's unresolved ask** (13/08 roster missing) and framed Friday's contribution as negative evidence that COMPOUNDS the ask, instead of re-falling on "another ghost day" — same shape as the 05/08 pour-missing pitfall's lesson about leading with the load-bearing question. Slip: the wrap runs long because two days of silence on 2631 stacked onto 2636's three-day streak makes Section 5 pile up; I'd like a cheaper way to track the cross-job question as its own class ledger, not surface it fresh every wrap. Next time: when the prior wrap's Section 5 leaves an ask open AND today adds zero new evidence, lead with the negative-evidence framing in two sentences, not the six-line restatement. To stop or manage this job, send me a new message (e.g. "stop reminder spike-wrap").